What to do after an unsatisfactory commercial EICR Turn an unsatisfactory commercial EICR into a clear response: control danger, prioritise observations and link repairs to suitable completion evidence. Get immediate advice on any danger, make affected equipment or circuits safe, and convert the observations into a prioritised work plan. Keep urgent remedial work distinct from advisory improvements. Commission clear scopes, obtain suitable completion evidence and link each action to the original report rather than assuming an invoice closes the issue. An unsatisfactory result is the start of a decision process. The useful question is which conditions created that result and what must happen to control them. Closing an entire building, ordering a full rewire or buying a replacement board are not conclusions that follow from the headline alone. Equally, filing the report until the next budget round leaves the findings unresolved. A good follow-up preserves the inspector’s evidence, deals promptly with danger and gives each remaining item a clear route to completion. This guide explains that process for a commercial facilities team. Establish what is safe to use now Contact the inspector promptly to confirm any immediate restrictions and actions already taken. C1 describes danger present; C2 describes a potentially dangerous condition requiring urgent remedial attention. Do not let the usual purchase order process become the reason a known danger remains accessible or energised. The competent person should advise on making the affected part safe. That may involve isolation or another suitable measure, depending on the defect. Record precisely what is restricted and tell the people who control that area. A general email saying the electrics failed is much less useful than an identified circuit with a clear instruction. Separate findings by their actual meaning Create a register with observation reference, location, code, defect, interim control, action owner and target. Keep advisory improvements visible without allowing them to obscure urgent work. Read the edition declared on the report: under A4:2026, C1/C2 drive an unsatisfactory outcome, whereas C3 and FI are advisory classifications. That change does not make FI irrelevant. It records a potential issue that needs more information before a classification can be settled. Ask what needs investigation, what access it requires and what precaution is appropriate meanwhile. Avoid turning uncertain findings into an unsupported promise that everything is safe. Include a status for interim controls that differs from permanent completion. A circuit made safe by isolation may have removed immediate exposure while leaving the required repair outstanding. Record the restriction, who controls it and what must happen before restoration. This prevents an urgent make-safe action being mistaken for a completed improvement or a permanently resolved defect. Commission a repair scope with traceability Ask the remedial quotation to identify which observations it addresses and what evidence will be supplied. A price for board works is difficult to assess if the original report contains several different defects around the same board. An item-by-item link makes comparison and later checking much easier. In a hypothetical office, a quote includes replacing damaged accessories and improving identification, while a separate option modernises sound equipment. The client should be able to distinguish the work needed to address the reported safety findings from a planned improvement. The technical reasoning matters more than whether the proposal is described as a package. Agree access, interruption and changes Remedial work can need its own isolations and specialist support. Confirm which users will be affected, how equipment will be shut down and who will authorise restart. An inspection visit and a repair visit have different tasks; the second appointment should not inherit an unsuitable plan simply because it concerns the same installation. Agree how newly exposed defects or additional work will be communicated. Require a clear description and explanation before routine scope changes, while preserving the contractor’s ability to deal with immediate danger. Record what was discovered, what was authorised and any further areas that remain outside the agreed work. Close the evidence loop Obtain the documentation appropriate to the work performed, which may include an Electrical Installation Certificate, Minor Electrical Installation Works Certificate or other suitable records. Ask the contractor how the original observations have been resolved. A payment receipt records a transaction; it does not by itself describe electrical verification. Finish with a review of the register, including items awaiting parts or access. Keep open items open: a near-complete repair package should not conceal the one condition that still needs attention. Original report and schedules retained without alteration. Immediate restrictions communicated to affected teams and occupiers. Every safety observation linked to work and completion evidence. Investigation findings recorded with their resulting decisions. Advisory improvements considered in the maintenance or capital plan. Any need for further inspection or a new report explicitly agreed.