Create an electrical testing handover that the next team can use Create a usable electrical testing handover with complete reports, schedules, asset records, action links, unresolved gaps and shared document access. Retain the complete report and schedules, the agreed scope, equipment results where relevant, and a register linking findings to actions and completion evidence. Include limitations, unavailable items, current drawings and responsible roles. A useful handover shows what was assessed, what changed and what still needs attention without relying on one person’s memory. Electrical records often become difficult at exactly the wrong moment: when a building changes hands, a contractor is replaced or the facilities manager leaves. A folder full of PDFs may contain the evidence, yet still leave the next person unable to tell which report is current or whether a repair was completed. Good handover is therefore an information task as well as a document task. The aim is to preserve the original technical records and add enough structure for another competent team to act on them. This guide sets out a manageable approach for commercial sites. Keep the complete original evidence Store the signed EICR with its inspection schedule, circuit details, test results and continuation pages. Preserve the report number, inspection dates and declared standard. If there are separate reports for buildings or supplies, show that structure in the index rather than combining loose pages into an apparently single report. Keep equipment records in a usable form, with identifiers and outcomes that can be linked to the inventory. A printed summary total is less useful than item-level information when a damaged appliance needs to be traced. Retain any explanatory notes about tests not performed, unavailable items or special assessment arrangements. Separate history from the current position Do not overwrite the original report when work is completed. Add later repair records, certificates and decisions with dates and links back to the relevant observation. Historic evidence matters because it explains what was found at that time; the current action register explains what happened afterwards. Use a simple document index: record type, premises or board, reference, date, status and file location. Mark superseded drawings clearly while retaining them where useful. A later installation certificate may cover only an alteration, not replace the earlier condition assessment of the rest of the building. Include a brief read-me document explaining the folder structure and the current position. It should identify the latest relevant reports, open actions, scope boundaries and responsible roles. Keep it factual and link to the source evidence. The document is a navigation aid, not a replacement technical report, and should be updated when a material action or responsibility changes. Original EICR | Its complete schedules and declared extent. Remedial evidence | The observation or defect it addresses. Alteration certificate | The actual work and affected circuits. Equipment result | The stable asset or component identifier. Open limitation | Its owner, effect and recovery decision. Build an action register that survives staff changes For each finding, record the source reference, affected asset or location, immediate control, responsible role, due action and closure evidence. Avoid closing an item on the basis of a verbal assurance that someone dealt with it. Ask what work was done and what suitable evidence supports the conclusion. In a hypothetical handover, an old EICR is unsatisfactory but all urgent observations have later documented repairs. Present both the report and the linked completion records. Do not describe the old report as newly satisfactory or hide it because the headline seems inconvenient. The chain of evidence is what makes the history understandable. Preserve the unresolved boundaries List limitations, unassessed areas and equipment absent during the visit. Include the reason, effect, owner and planned recovery. These gaps are easy to lose when a project is described as complete because the contractor has delivered its agreed documents. Also record responsibility boundaries between landlord, tenant, service provider and internal teams. Attach the relevant agreed scope or responsibility schedule. A new manager should be able to identify who controls a shared board or specialist system without reconstructing the lease arrangements from a chain of informal emails. Make access and review routine Store records in a controlled shared location with a sensible naming convention and backup. Give appropriate people access without circulating sensitive operational information unnecessarily. Keep an exportable copy of important registers so a change of supplier or software does not make the maintenance history inaccessible. Arrange a short handover meeting for significant sites. Walk through one completed item, one open item and one scope boundary. If the receiving team can follow those three examples from the index to the evidence, the system is likely to be usable when a real decision is needed. Complete reports and all referenced schedules are present. Installation work certificates are linked to the relevant alterations. Equipment identifiers connect inventory, findings and repairs. Every closed finding points to appropriate completion evidence. Limitations and missing items remain visible until resolved. Future review dates and responsible roles are recorded.