Managing emergency lighting defects from report to verified repair A defect register that connects failed assets, interim decisions, repair work and follow-up evidence. Record each affected asset and location, the test or observation that identified the issue, the immediate management decision and the person responsible for resolution. Keep limitations and untested assets separate from failures. Link repair evidence and suitable follow-up results to the original finding, and retain any unresolved question about coverage or system suitability. A report showing several failed lights is not yet a repair plan. The manager needs to know which routes are affected, whether the units share a possible cause, who can authorise work and what evidence will show that the issue has been resolved. A defect register brings those questions together without asking an administrator to make technical judgements. This guide concerns the management of reported findings in commercial and managed premises. Competent people should determine the technical response, any immediate precautions and appropriate follow-up. The spreadsheet or property system records those decisions; it does not replace them. Preserve what the original report actually says Create a unique action reference and link it to the report, date, test activity and asset identifier. Record the precise location and the finding in language faithful to the source. Do not turn 'not tested because access unavailable' into 'failed', or treat a missing result as a pass. Separate observed performance from suggested cause. A unit that did not operate may require investigation before the remedy is known. Similarly, a report identifying a concern about coverage may involve design or layout, rather than a defective fitting. Preserving that distinction helps the manager commission the right work and prevents an attractive replacement quote from answering the wrong question. Record the building-level response Ask the appropriate competent person what the finding means for the current premises and use. A defect on a particular route needs context, including other arrangements and the people who rely on it. Do not use the number of failed assets alone as a measure of seriousness. Record any immediate action, who agreed it and when it needs review. Where temporary arrangements are necessary, give them a separate owner and end condition. Avoid an open-ended note saying 'staff informed'. The register should explain what staff were told to do and how the arrangement is controlled. Significant concerns need prompt escalation through the property's established fire safety process. Commission investigation and repair clearly Where the cause is uncertain, state the investigation question and the required output. The contractor should understand whether the order authorises diagnosis, repair, replacement or a review of system suitability. Agree approval arrangements for additional work and a route for urgent decisions. Group related assets for efficient work, but retain individual references. Several units on one floor may share an issue, or may have unrelated faults. That is for technical investigation, not a spreadsheet assumption. Include access needs, safe working constraints and any interaction with occupancy or battery recovery in the work plan. Unavailable access should generate a further action rather than a closed attendance. Decide what completion must demonstrate Request evidence that relates to the original finding: what was investigated, what work was completed, which assets were involved and what suitable checks or tests followed. An invoice for replacement fittings establishes expenditure, not the outcome of the original defect. Keep the person reviewing completion evidence separate in the record from the person who supplied it. Technical acceptance may require competent review beyond the property administrator's role. If a repair resolves equipment performance while leaving a concern about layout or coverage, close only the relevant part. Link the remaining issue to the assessment or design review rather than losing it in a completed purchase order. Use the history to spot repeated problems Review repeat failures by asset and location, not just contractor or invoice. Repeated attention to the same fitting may justify further investigation; a new pattern following alterations may indicate a different question. Do not draw a technical diagnosis from a trend alone, but give the evidence to someone able to interpret it. At portfolio level, monitor unresolved significant findings, outstanding access and actions awaiting verification. Keep service-level dashboards linked to the underlying records so a manager can examine the exceptions. On handover, export both open actions and the relevant closed history. The next manager should be able to see why a decision was made and whether a recurring concern has already been investigated. Investigation required | Cause or appropriate response is not yet established Work authorised | Defined work approved; completion still outstanding Awaiting verification | Work reported complete; required evidence under review Closed | Relevant outcome accepted with evidence and remaining limits recorded