Planning emergency lighting tests around building operation Define test scope, occupancy constraints, recharge arrangements and follow-up for a managed building. Agree the system and areas in scope, the purpose of the test, safe access and how normal operation and battery recovery will be managed. Provide system information and previous findings to the competent tester. Specify asset-level results, urgent fault communication, restoration checks and follow-up, including any areas or equipment that cannot be tested. Choosing an appointment time is only one part of emergency lighting test planning. The work may interact with access, building use and the ability of batteries to provide their intended support after a test. Large or continuously occupied premises need those issues considered before attendance. This guide sets out a commissioning and coordination process for property managers. It does not instruct staff how to isolate supplies or conduct technical tests. The correct regime and method depend on the installation, applicable standards, manufacturer's information and risk assessment; a generic duration or one timetable cannot safely describe every building. Identify what the installation is intended to do Gather available plans, luminaire schedules, design and commissioning information, operating instructions and previous test reports. Identify self-contained units, central systems or other arrangements through the available records and competent advice. Do not guess system characteristics from appearance alone. State the premises boundary, including shared stairs, external routes and tenant-controlled areas that may be relevant. Describe current operation and any recent changes to partitions, hours or escape routes. A test of identified equipment and a review of whether the arrangement still suits the building are different tasks. Agree whether both are required, and how a concern outside the test scope will be reported. Specify the test purpose and evidence Use clear terms in the order. Functional testing and duration testing answer different questions, while inspection of coverage or design adequacy may require a separate scope. Ask the provider to identify the intended activity, applicable basis and limitations in its proposal. Agree how assets will be identified and results recorded. If the existing schedule is incomplete, commission reconciliation explicitly. Ask how automatic test information, where present, will be reviewed rather than assuming an automatic system removes all management work. Request a separate list of inaccessible or untested assets. A report that covers some equipment should not be filed as evidence that the whole installation was examined. Plan the period after testing Consider the possibility of a normal-lighting failure during or after the work, including while batteries recover. Essex fire service guidance highlights minimum-risk timing and the recharge period. Ask the competent provider to explain the recovery arrangements for the actual installation and the implications for occupancy. Do not assume that lights returning to their normal appearance means full emergency capacity has been restored. Nor should a universal recovery time be copied from another building. Where a site operates continuously, competent planning may need a staged approach or other appropriate arrangements. Record the agreed plan, who has authority to implement it and how any condition preventing the work from proceeding will be escalated. Coordinate access and other building work Give the tester the site's induction, security, escort and safe-access requirements. Identify high-level fittings, secure rooms and activities that affect access. The contractor should plan a suitable safe method; site staff should not improvise access equipment to keep the programme moving. Coordinate with other maintenance, events and occupancy changes. An electrical shutdown or refurbishment may alter the assumptions used for the lighting work. Inform affected occupiers about the agreed arrangements in useful plain language. Ensure the contact on the day can reach the person responsible for fire safety decisions, particularly if a defect affects an occupied route or the planned recovery arrangements cannot be achieved. Agree restoration, findings and closure Specify how completion and restoration of the installation will be recorded, within the agreed scope. Ask for immediate communication of significant concerns and a final report that distinguishes test failures, inspection observations and limitations. The report should support decisions without overstating what a successful test proves. Transfer findings to an asset-linked defect register, with an owner and risk-based response. Plan repairs and appropriate follow-up testing through competent people. Retain evidence that answers each finding, and keep unresolved coverage or design questions open. A successful attendance is the beginning of the evidence trail; management still needs to review results and maintain the system. Scope, system information and activity agreed Occupancy and recovery arrangements considered Access and other works coordinated Urgent communication and restoration record specified Defect ownership and follow-up process ready