The commercial inspection site readiness checklist Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption. Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption. Confirm which areas and services are included, which supplies must stay available and how urgent findings will be communicated. Readiness means the agreed inspection can proceed safely; unlocking the front door is only one part of it. An engineer can arrive on time and still be unable to do the agreed work. The board may be behind stock, the person with the key may be away, or the occupier may never have agreed to a shutdown. These are planning problems that a short readiness review can reveal. Use this guide before a commercial EICR or a coordinated inspection visit. It gives the site team a practical handover structure, while leaving electrical methods and safety decisions to the competent people doing the work. Adapt it to the premises instead of treating every item as universally applicable. Walk the intended route Ask the local contact to walk the route from arrival to the relevant rooms. Check where the engineer can sign in, park, unload, obtain keys and meet the person responsible for operations. Identify restricted rooms without asking untrained staff to open electrical enclosures. Photographs of board locations and existing labels can help where they can be taken safely. A site that looks straightforward on an address list may have several entrances and quite different access arrangements for each occupier. Gather information that changes the job Send useful records rather than a large unfiltered archive. Existing EICRs, circuit schedules, drawings and known defect information may change the scope or the time needed to understand the installation. Share relevant hazards through the organisation’s normal controls, including asbestos information where it could affect the work. Reaction Group’s standard terms describe accessibility limitations and distinguish detailed circuit tracing from a standard EICR. Clarify these matters while preparation is still possible. Physical access | Check board routes and representative accessories are reasonably accessible. | Safe location photographs and clearance confirmation. Authority | Name the person who can agree interruption and operational consequences. | Written approval for the proposed window. Records | Identify the latest available schedules and previous report. | A short document index with version dates. Hazards | Provide site-specific information relevant to the intended work. | The applicable induction and hazard briefing. Communication | Agree urgent finding contacts and an available backup. | A tested contact list for the visit period. Confirm readiness with evidence Use a readiness call to confirm decisions, not simply to repeat the appointment date. Ask what can be isolated, who has approved it and how affected staff will be told. Include the operational owner of connected equipment where required. The engineer must determine safe electrical working arrangements; the client should provide accurate information about the consequences of interruption. If the site cannot release an agreed area, raise it before attendance so the scope and booking can be reconsidered. Confirm actual room and board keys, rather than assuming reception holds them. Tell occupants what access is needed and who is arranging any equipment shutdown. Clear agreed routes without disturbing electrical equipment or creating another hazard. Reconfirm changes promptly if the approved work window becomes unavailable. The board is unlocked, but the pallets are still there Picture a hypothetical warehouse visit booked for Monday morning. The site contact confirms that the electrical room will be unlocked. On Friday, a delivery is stored in front of the distribution board; the contact can open the room but has no authority to move those goods. A readiness check needs to reach the warehouse supervisor who controls clearance. Ask that team to arrange safe removal before the visit and confirm the route afterwards. A location photograph can help confirm clearance where it can be taken safely, without opening electrical equipment. Include a final check in the shift handover so another delivery does not occupy the space again. If clearance cannot be arranged, tell the supplier before attendance and review the proposed work. “Keys available” and “installation accessible” are different facts, and both belong in the briefing. Record what the site could not release Keep a record of changes between readiness confirmation and attendance. A late delivery may block a board; a new tenant may control a key; an urgent business activity may remove the outage window. Record the actual restriction and agree the next step instead of describing an incomplete visit as fully completed. After the inspection, compare the delivered extent with the instruction and ask for clarification where a limitation is unclear. The readiness file should make that comparison easier.