Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Fire safety · Question explained

Fire risk assessments in buildings with several occupiers

The boundary on a lease plan does not stop smoke, and a shared staircase does not belong to only one person's emergency plan. Multi-occupied properties need assessments and management arrangements that recognise those connections.

Request a fire risk assessment
The short answer

How should fire risk assessments be coordinated in a multi-occupied building?

Identify who controls each area and which routes, systems and arrangements are shared. Relevant Responsible Persons must cooperate and coordinate under the Fire Safety Order in England and Wales. Assessments should take account of those interfaces, with clear information exchange and action ownership. Separate tenant reports do not automatically establish that the whole building is adequately covered.

Problems arise when each party assumes another has covered the common issue, or when a change inside one tenancy never reaches the building manager. This article looks at the practical interfaces in commercial and mixed-use buildings. It does not assume that every building needs one identical reporting structure. The useful structure is the one that reflects legal duties, actual control and the way people use the premises.

In this article 5 sections
  1. Draw the shared building before dividing the tasks
  2. Exchange information that changes other people's decisions
  3. Make assessment coverage explicit
  4. Resolve cross-boundary findings with a named lead
  5. Use change control as the continuing link
01

Draw the shared building before dividing the tasks

Create a plan showing tenancies, common parts, shared routes and significant systems. Add the practical management boundaries: who controls a secure door, who maintains a shared system and who receives defect reports. Include areas that are easy to overlook, such as service corridors or external escape routes.

The exercise may reveal overlap rather than a neat division. That is useful. Record the overlap and agree how it is managed. Avoid treating a coloured plan as a legal determination by itself; the underlying duties and contracts need consideration. The plan is a working aid for coordination and for explaining scope to assessors and contractors.

02

Exchange information that changes other people's decisions

Relevant information includes risks that can affect other occupiers, changes to shared arrangements and important defects. A new activity, altered hours or a changed escape route may matter beyond the tenant boundary. Explain what information each party should send, to whom and before which changes.

Use a recorded contact schedule rather than an informal chain of personal emails. Current Home Office guidance explains duties to establish and record other Responsible Persons and share relevant identity and responsibility information. Keep operational contacts as well, since the person legally identified may not be the person arranging access on the day. Review both when a tenant or agent changes.

03

Make assessment coverage explicit

Ask each assessment to describe its premises boundary and relevant interfaces. A landlord's report may address common parts while a tenant's report addresses its workplace, but the relationship between them still needs attention. Missing access to a suite should not disappear behind the phrase 'tenant responsibility'.

Where one coordinated assessment is proposed, establish whose duties and areas it supports, what information will be supplied and who receives the findings. Where separate assessments are used, arrange suitable exchange and review of information affecting others. The aim is complete consideration of the relevant risks, not merely a matching set of report covers for every tenant.

04

Resolve cross-boundary findings with a named lead

A finding may require action from more than one party. For example, changing an access arrangement might involve the tenant, owner and system contractor. Assign a person to coordinate the issue while preserving each party's responsibilities. Record dependencies and approvals instead of passing the action repeatedly between registers.

Give urgent concerns a reliable escalation route. Important information should not wait until a quarterly occupier meeting. When work is completed, share the relevant outcome with affected parties and update linked records. If a responsibility dispute remains, obtain appropriate advice and keep the safety implications under active management. An unresolved commercial allocation does not make the underlying condition disappear.

05

Use change control as the continuing link

Coordination is not finished after the assessments are issued. Tenant fit-outs, new businesses and changed working hours can alter assumptions. Include a fire safety review point in licence-to-alter and property change processes where appropriate, with suitable technical input.

Use periodic meetings to review changes, shared-system issues and unresolved actions, but keep immediate reporting available between meetings. Record decisions in a way that incoming occupiers and managers can understand. A good shared-building programme can answer three questions quickly: what is covered, who needs to know about a change and who owns the next action. That clarity is more valuable than assuming one party's current report covers everybody.

InterfaceQuestion to resolve
Shared escape routeWho controls access, checks concerns and communicates changes?
Shared protective systemWho maintains it and informs affected occupiers of failures?
Tenant alterationsWho reviews effects beyond the tenancy?
Joint findingWho coordinates approvals and completion evidence?
Related questions

Fire risk assessments questions.

Does every tenant need its own report?

The reporting arrangement should support the applicable duties and premises scope. Do not assume one format suits every building; establish coverage and coordination with suitable advice.

Can the landlord ignore risks inside a tenancy?

Risks within one area may affect others. Relevant dutyholders need cooperation and information exchange, while their precise duties depend on control and the legal framework.

What happens when a tenant refuses to share information?

Record appropriate requests and escalate through the relevant management and legal routes. Consider what uncertainty means for the building's assessment and arrangements with competent advice.

Research & further reading

Sources used for this article.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. Fire safety duties under section 156 ↗

    Full assessment and arrangements records, assessor identification, cooperation and successor information.

  2. Home Office: Fire Safety Order enforcement supplement ↗

    Explains cooperation records and relevant information passed between successive Responsible Persons.

  3. Home Office guide for people with fire safety duties ↗

    Explains responsibility, competent assistance and scope; no service contract transfers every duty.

Inspection service

Fire risk assessments: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request a fire risk assessment

Provide tenancy and common-area plans, current reports and the shared arrangements to consider.

No contact details needed for these first questions.Prefer to talk? 0203 885 2299
Call the teamGet a quote