Agree the test window
Identify the system, required test, logbook, occupancy and access arrangements.
System information + accessCheck how your emergency lighting performs when the normal supply fails. Arrange the right test and plan it around safe occupation of your building.
Request emergency lighting testing
The purpose differs. Select a test type to see what needs to be discussed.
A functional test checks that emergency lighting operates. Agree the systems, locations, test method and recording arrangements.
Enquire about functional testingDuration testing considers sustained operation. The required duration depends on the installation; battery recharge and building occupancy need to be planned.
Enquire about duration testingTell us what was last tested, when it was done and whether defects were recorded. The appropriate scope can be discussed before attendance.
Ask about the testing requiredThe visit needs more than access to a test point. Explain when the building is occupied and what arrangements apply.
Identify the system, required test, logbook, occupancy and access arrangements.
System information + accessCheck the lighting within the agreed scope and record its performance and any defects.
Results + identified issuesConsider battery recovery and any implications for safe occupation before returning to normal arrangements.
Recharge + follow-up planRecords should connect the result to a light or area so your team can arrange follow-up. Testing and remedial work need clear scopes.
Discuss existing lighting defectsIllustrative reporting topics · Documents depend on the booked service
Existing records help explain the installation, previous tests and outstanding defects. Unknown quantities are accepted in the enquiry.
No. The appropriate test period and requirements depend on the installation and applicable standards. Share the system information and existing records rather than assuming a single duration applies to every building.
Occupancy needs to be considered with the test type and battery recharge. Explain normal hours and any emergency-lighting dependencies so suitable arrangements can be agreed.
Agree testing, reporting and remedial work separately. A recorded defect may require repair, replacement or further investigation outside the testing scope.
Use the combined-services enquiry if you need other inspections. Each service still requires its own scope, access arrangements and suitable scheduling.
Use the relevant route for the operational detail, access questions and quotation information for your premises.
Functional tests, duration tests and battery recharge answer different questions. Plan them around the occupied building.
Understand the usual monthly and annual programme, system differences and the records that make testing useful.
Read the answer Question explainedUnderstand the different evidence from a short operational test and a test of sustained emergency performance.
Read the answer Question explainedCompare installation scope, test activity, access, occupancy planning and reports before comparing price.
Read the answer Question explainedConsider recovery, occupancy and handover after emergency lighting tests, rather than ending the plan at attendance.
Read the answerTell us whether the requirement is testing, maintenance, installation or a design appointment. Existing layouts, system information and the intended work help the team define the instruction.
Add the site locations, preferred dates and any access or reporting requirements.
Add your sites, inspection requirements and preferred dates