Servers & communications
Identify essential supplies and who can authorise an interruption.
Find out what condition your fixed wiring is in. Arrange testing around your building’s access, critical equipment and operating hours.
One commercial building or a nationwide estate · Directly employed engineers

Some tests require circuits to be isolated. Flag the restrictions before a date is agreed.
Identify essential supplies and who can authorise an interruption.
Explain shutdown windows, restart procedures and critical loads.
Confirm keyholders, permits, escorts and access to every board.
Select the closest option. Your choice carries into the enquiry.
Availability and the safe testing sequence are agreed after a real enquiry.An EICR assesses the condition of an existing fixed electrical installation. It is different from appliance testing.
Looking for appliance testing?Identify the installation, boards and circuits. Record access restrictions and agree any limitations.
Assess visible condition and protective measures, with electrical tests appropriate to the installation and agreed scope.
Receive an Electrical Installation Condition Report with observations, classifications and the recommended next inspection date.
The report records an overall satisfactory or unsatisfactory outcome. Observations explain the action needed.
Understand EICR classificationsUnder BS 7671:2018+A4:2026, C1 or C2 observations make the outcome unsatisfactory. FI and C3 are advisory. Historic report wording may differ; read the edition and recipient notes.

Tell us about the existing report and the affected circuits. The next action may be investigation or repair rather than a full repeat inspection.
The quote depends on the circuits, installation, locations, access and working hours. Share an existing report or circuit schedule if available. Unknown quantities can be confirmed during scoping.
There is no single interval for every installation. The competent inspector considers use, condition, maintenance and external influences, alongside any legal or contractual requirement.
The inspection scope and remedial work should be clearly distinguished. Ask for findings to be reviewed and any additional repair work to be quoted separately.
Choose “I don’t know the quantity yet” in the enquiry. Tell us the building type, size and access arrangements so the missing information can be discussed.
Use the relevant route for the operational detail, access questions and quotation information for your premises.
Costs, certificate types, existing reports and inspection intervals. Get the facts before arranging the work.
Compare commercial EICR quotations by circuit information, scope, access, isolation windows, reporting and uncertainty rather than headline price alone.
Read the answer Question explainedChoose commercial EICR intervals from competent advice, actual condition and use, maintenance evidence and specific requirements, rather than a blanket date.
Read the answer Question explainedUnderstand the different scopes of an EICR, an Electrical Installation Certificate and minor works evidence before requesting the wrong document.
Read the answer Question explainedFind the right electrical record, request a complete copy and understand what online certificate searches can check before booking another inspection.
Read the answer Question explainedUnderstand energy ratings, electrical condition reports and the separate questions to resolve when letting, taking or handing over commercial premises.
Read the answer Practical guideTurn an unsatisfactory commercial EICR into a clear response: control danger, prioritise observations and link repairs to suitable completion evidence.
Read the guideAdd the site locations, preferred dates and any access or reporting requirements.
Add your sites, inspection requirements and preferred dates