Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Commercial fixed-wire inspection & testing

Commercial
EICR testing.

Find out what condition your fixed wiring is in. Arrange testing around your building’s access, critical equipment and operating hours.

One commercial building or a nationwide estate · Directly employed engineers

Illustration of an electrical inspector and facilities contact beside closed commercial distribution boards.
Plan the visit

Which parts of your building
must keep running?

Some tests require circuits to be isolated. Flag the restrictions before a date is agreed.

01

Servers & communications

Identify essential supplies and who can authorise an interruption.

02

Production & refrigeration

Explain shutdown windows, restart procedures and critical loads.

03

Occupied or secure areas

Confirm keyholders, permits, escorts and access to every board.

Prepare your enquiry

What access can you offer?

Select the closest option. Your choice carries into the enquiry.

Availability and the safe testing sequence are agreed after a real enquiry.
What is inspected

From the distribution board
to the circuits it supplies.

An EICR assesses the condition of an existing fixed electrical installation. It is different from appliance testing.

Looking for appliance testing?
A. Establish the scope

Identify the installation, boards and circuits. Record access restrictions and agree any limitations.

B. Inspect and test

Assess visible condition and protective measures, with electrical tests appropriate to the installation and agreed scope.

C. Record the findings

Receive an Electrical Installation Condition Report with observations, classifications and the recommended next inspection date.

Your EICR report

Know which findings
need attention.

The report records an overall satisfactory or unsatisfactory outcome. Observations explain the action needed.

Understand EICR classifications
C1Danger presentImmediate action required.
C2Potentially dangerousUrgent remedial action required.
FIFurther investigationInvestigation advised under A4:2026.
C3Improvement recommendedReview the recommendation.

Under BS 7671:2018+A4:2026, C1 or C2 observations make the outcome unsatisfactory. FI and C3 are advisory. Historic report wording may differ; read the edition and recipient notes.

Illustration of an electrical inspector and facilities contact reviewing an existing report and circuit schedules.
Already have an unsatisfactory report?

Start with the findings.

Tell us about the existing report and the affected circuits. The next action may be investigation or repair rather than a full repeat inspection.

Before you enquire

Commercial EICR questions.

How much does a commercial EICR cost?

The quote depends on the circuits, installation, locations, access and working hours. Share an existing report or circuit schedule if available. Unknown quantities can be confirmed during scoping.

Is every commercial EICR due after five years?

There is no single interval for every installation. The competent inspector considers use, condition, maintenance and external influences, alongside any legal or contractual requirement.

Are repairs included in the inspection quote?

The inspection scope and remedial work should be clearly distinguished. Ask for findings to be reviewed and any additional repair work to be quoted separately.

What if there are no records or circuit counts?

Choose “I don’t know the quantity yet” in the enquiry. Tell us the building type, size and access arrangements so the missing information can be discussed.

BEFORE YOU ARRANGE THE WORK

EICR questions, answered.

Costs, certificate types, existing reports and inspection intervals. Get the facts before arranging the work.

Quote enquiry

Request an EICR quote.

Add the site locations, preferred dates and any access or reporting requirements.

Add your sites, inspection requirements and preferred dates
Call the teamGet a quote