EICR testing
Inspection and testing of fixed wiring, with a condition report and classified observations.
EICR, PAT testing and fire safety inspections for commercial premises and multi-site estates.

Choose why you’re enquiring. Then add the service, site details and preferred dates.
Choose the answer that’s closest to your situation.
Check what each service includes, which records you receive and how to request a quote.
Inspection and testing of fixed wiring, with a condition report and classified observations.
Appliance inspections, electrical tests and an equipment register.
Assessment of fire hazards, existing precautions and recommended actions.
Door-by-door checks with photographs and recorded defects.
Condition checks, routine servicing and maintenance records for fire extinguishers.
Functional and duration tests, recorded results and identified faults.
Select the services and include all site locations in one enquiry.
Choose a requirement to add it to your enquiry.
Tell us when your site needs to stay operational. We’ll agree access and shutdowns before attendance.
See what was checked, which defects were found and what needs attention. The documents depend on the service booked.
Six fictional project scenarios showing how inspection work can be planned around different buildings, people and reporting needs.
Keeping critical equipment running while checking the fixed electrical installation.
An office team needs an EICR, but its IT equipment and reception must remain available during the working day.
Review the previous report and circuit schedules. Identify critical supplies, agree isolation windows with the facilities team and give occupants clear notice of the affected areas.
A condition report and test schedules, with observations tied to the relevant boards and circuits. Any untested areas and follow-up actions are recorded.
Different opening hours and local contacts, brought together in one coordinated programme.
A property team is coordinating inspections across 12 fictional stores, each with its own manager, opening hours and access arrangements.
Build a site list with addresses, circuit estimates and local contacts. Agree the order of visits, escalation route and report naming before the first engineer attends.
A site-by-site report pack and a clear list of access limitations and outstanding actions, using the property references agreed with the client.
Preparing equipment lists and access so checks fit the school’s available working window.
A school wants its portable electrical equipment checked during the holiday, including classrooms, offices, kitchens and maintenance stores.
Agree the equipment in scope, arrange room access and identify sensitive or specialist items. Use the existing register where available and keep staff informed about items that must be available.
An updated equipment register and test results. Failed items are identified for the school’s action, with any equipment not presented for inspection recorded.
Door identification, resident access and photographic findings organised building by building.
A managing agent needs communal and flat entrance doors inspected across four fictional blocks, with resident appointments required for part of the work.
Prepare the door schedule, confirm the inspection scope and agree who handles resident communication. Record missed access separately so it can be followed up without losing track of individual doors.
Door references, locations, photographs and identified defects. The agent can assign follow-up work to the right building and door, alongside a list of doors still requiring access.
Assessment planning that accounts for deliveries, storage and changing work areas.
A warehouse has changed its storage layout and wants the fire risk assessment to reflect how the premises is now used.
Make the existing assessment and fire-safety records available. Walk through the changed areas with the relevant site contacts and consider the people, activities, escape arrangements and fire precautions.
A building-specific assessment with findings and recommended actions. The site team can allocate owners, track progress and keep the assessment under review as operations change.
Planning test areas, occupancy and battery recharge before attendance.
A hotel needs emergency lighting testing while rooms and shared areas remain in use. The timing must account for guest access and the recharge period after duration tests.
Confirm the test type, available records and affected areas. Agree suitable working windows and the precautions needed to keep escape routes safely usable during testing and recharge.
Recorded test results and identified defects, with locations that help the hotel arrange follow-up. The management team retains the records alongside its wider fire-safety information.
Feedback on the people carrying out the work.
Read feedback on Reaction’s websiteVery pragmatic, conscientious engineer who went above and beyond.
Select your building type to begin an enquiry.
People, meeting rooms, IT and access windows.
Enquire about this building type02Production, critical loads and site procedures.
Enquire about this building type03Multiple contacts, occupied spaces and consistent records.
Enquire about this building type04Sensitive environments, safeguarding and planned access.
Enquire about this building typeRequest services for one property or multiple locations. Include each postcode and the required dates.

Provide the site details, confirm the quote and agree the appointment.
Choose the service and add the site addresses and required dates.
Service and site detailsAgree the work included, price, access and appointment dates.
Price, access and datesReceive the agreed documents and review any defects or recommended follow-up.
Reports and follow-upCoverage, access, reporting and booking more than one service.
Get a testing & inspection quoteReaction has a nationwide directly employed team. Share your full property list, services, access contacts and deadlines so scheduling and reporting requirements can be considered together.
Some electrical tests require isolation and other services need access to occupied areas. Explain critical equipment, opening hours and site restrictions before attendance so suitable arrangements can be agreed.
Yes. Use the combined programme route and identify the services involved. Each discipline needs an agreed scope, suitable engineer availability and clear reporting expectations.
There are dedicated EICR routes for facilities management companies and electrical contractors, including programme and reporting requirements. White-label attendance should be agreed before mobilisation.
Start with the situation: an upcoming deadline, an existing report, a new responsibility or a wider programme. The enquiry asks the relevant questions and lets you leave technical quantities to be confirmed.
Select the service, add your site locations and tell us when the work is needed.
Add your sites, inspection requirements and preferred dates