EICR codes explained: C1, C2, FI and C3
An interactive explanation of report outcomes, current classification codes and follow-up questions.
Reference guides for planning inspections, preparing sites and managing the records afterwards. Checklists, comparisons and detailed explanations you can return to.
Find a guide
39 guides · Electrical testing, fire safety & commercial planning
Try “wiring check prices” or “testing after we close”.
An interactive explanation of report outcomes, current classification codes and follow-up questions.
Risk-led equipment maintenance, an interactive review brief and HSE guidance on inspection and testing.
Organise owners, priorities and completion evidence, with a planning checklist and blank register.
Coordinate EICR and equipment maintenance while keeping distinct technical scopes, useful records, planned shutdowns and separate completion measures.
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
A practical evidence pack, access plan and briefing for a useful commercial fire risk assessment.
Specify the report reference, installation identity, agreed extent, limitations, observations and required supporting records.
Coordinate commercial electrical isolations with critical systems, alternative supplies, competent control, authorised shutdowns and restoration checks.
Hand over an indexed record of the installations and services concerned, current reports, unresolved findings and relevant maintenance information.
Coordinate the inspection scope with the actual education calendar, site access arrangements and the people responsible for facilities and safeguarding procedures.
Prepare a useful circuit inventory for an EICR quote, with clear board references, submains, three-phase conventions and uncertainty kept visible.
Read an EICR beyond its headline result: understand extent, limitations, observations, inspection schedules, circuit results and the next actions.
Understand EICR scope, agreed and operational limitations, sampling and unresolved coverage before comparing quotes or closing an inspection project.
Give the testing team a defined scope, current site information and a clear communication route before attendance.
Turn an unsatisfactory commercial EICR into a clear response: control danger, prioritise observations and link repairs to suitable completion evidence.
Create a usable electrical testing handover with complete reports, schedules, asset records, action links, unresolved gaps and shared document access.
A defect register that connects failed assets, interim decisions, repair work and follow-up evidence.
Define test scope, occupancy constraints, recharge arrangements and follow-up for a managed building.
A decision process for replacement recommendations, costs, continuity and asset records.
Build the programme from verified inspection records, site responsibilities and operational constraints.
A practical structure for identifying fire doors and connecting evidence, inspections and remedial work.
Define door populations, inspection scope, access, reports and follow-up before the programme starts.
A practical access campaign for flat entrance door checks and inspections in managed residential buildings.
A clear service brief for asset coverage, findings, replacement approvals and site records.
A workable action register that connects findings, decisions, responsibility and verified completion.
Define boundaries, evidence, access and decision routes for coordinated fire safety appointments.
An evidence-led handover of responsibilities, current arrangements and unfinished fire safety work.
Organise live fire safety records, historical evidence and unresolved actions for a commercial property.
Plan a clear route from inspection findings to authorised repairs, with named approvers, controlled changes and traceable completion evidence.
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
A useful tender defines the properties, installation boundaries, quantities, access conditions and reporting handover before asking for a price.
Map the office’s electrical areas, business-critical equipment and realistic interruption windows before booking.
Build an equipment inventory that tracks assets, leads, chargers, locations and exceptions so inspection coverage can be reconciled after the visit.
Write an equipment maintenance policy covering responsibilities, user checks, suitable inspections and tests, defect control and risk-based review.
Plan office equipment maintenance around IT shutdowns, accessible leads, suitable methods, shared chargers and a clear record of deferred items.
Organise portable tool inspections across shifts, stores and mobile teams, with clear accessory records, withdrawal controls and follow-up actions.
Prepare a consistent store brief while checking the local differences that affect access and interruption.
Plan around goods movement, restricted areas, access height and operational dependencies.
A white-label handover should join agreed customer presentation to an intact technical record.
Try another phrase or choose a different subject. You can also browse the full library.
Blogs address individual questions about inspections, equipment and reporting.