Electrical testing
& fire safety
in Bristol.
Request EICR, PAT testing and fire-safety inspections for your premises. Start with the building, what has changed and the records you already have.
Request a Bristol inspection quote
New responsibility,
changed premises
or a testing deadline?
Choose the situation closest to yours. The enquiry lets you explain the issue before quantities are confirmed.
Taking over premises
Identify the available reports, asset records and outstanding actions. Say what information is missing.
Describe the new premises →The building or its use has changed
Explain layout changes, new equipment, occupancy or altered access arrangements.
Explain what has changed →An inspection is due
Choose the service and share the latest report, recommended date and any fixed deadline.
Arrange the inspection enquiry →Check that the records
describe the premises
as they are now.
A report from an earlier layout or use may need context. Tell us about changes so the appropriate inspection or assessment scope can be discussed.
Do not assume that having a document answers every question about current condition or fire risk.
Useful points to review
Read the service scope.
Then request the work.
Use EICR for fixed wiring, PAT testing for appliances and the specific fire-safety pages for assessment, doors, extinguishers or emergency lighting.
Combine services in one enquiryBristol inspection enquiries.
What if a previous report has defects?
Start with the existing-findings route and identify the report. Include the observations and any work already completed. Investigation or repairs may be needed before a repeat inspection is considered.
Can you work in premises with guests or residents?
Explain the occupancy, room access, notice requirements and available working windows. Access and suitable arrangements must be agreed before attendance.
Can a Bristol site be part of a wider estate?
Yes. Include the other locations and explain any differences in the services, records, deadlines and local contacts.
What if we do not know the equipment or circuit count?
An estimate is enough to start. Mark the quantity as unknown if needed and include any existing reports, schedules or equipment lists that can help establish the scope.
Start with the building
and what you need checked.
Select the inspection, add the site details and tell us when the work is needed.
