Critical equipment
Tell us about production equipment, refrigeration, IT, alarms and supplies that cannot be interrupted without permission.
Arrange inspections for your workplace, operational site or managed property. Explain the equipment, access and operating restrictions that the visit must account for.
Request a Birmingham quote
Some fixed-wire tests require circuits to be isolated. The inspection plan needs to account for the actual installation and site processes.
Tell us about production equipment, refrigeration, IT, alarms and supplies that cannot be interrupted without permission.
Confirm the authorised contacts, permits, induction and arrangements for safe isolation and restart.
Explain shifts, planned shutdowns and maintenance periods. Dates and engineer availability need to be agreed.
EICR and PAT testing cover different electrical risks. Fire risk assessments, door inspections, extinguisher servicing and emergency lighting tests each have a defined scope.
For work across several disciplines, use a combined enquiry and confirm the records required for each.
Request several servicesProvide your site references and existing asset information. Agree how distribution boards, circuits or equipment should be identified in the reports.
Describe the installation, processes, critical equipment and access controls. The scope, safe working arrangements and suitable timing must be confirmed for your premises.
No. Enquiries can cover offices, retail, education, managed property and other commercial premises. Select the relevant building type in the form.
Include the proposed dates and the work that must be completed in that window. Availability and delivery commitments need confirmation.
Yes. Use the dedicated electrical-contractor route to explain tender stage, circuit volume, sites, branding and delivery requirements.
Add estimated quantities, site access restrictions and the dates you need the work completed.