Commercial guide 4 min read

Inspection findings.Authorise the right work.

Keep the finding, proposed response and approval decision connected before further work is ordered.

Illustration of inspection paperwork, a magnifying glass and a testing case beside a commercial distribution board
A clear route from finding to decisionREACTION / GUIDES
The short answer

How should inspection findings become authorised remedial work?

Separate immediate safety action from routine commercial approval. Give each finding a traceable reference, assign a competent review where needed and record who can approve scope, spending and operational disruption. Keep the original inspection evidence, the authorised work instruction and the completion evidence linked. An accepted quotation is not, by itself, proof that a finding has been resolved.

Inspection findings often arrive at the junction of several responsibilities. The site controls access, the facilities team manages maintenance, a budget holder approves cost and a technical person explains the proposed work.

Without a shared process, everybody can believe the next step belongs to someone else. This guide describes a practical authorisation path from finding to evidence of completion. It is especially useful where several suppliers or customer teams are involved. It does not set a universal response deadline or replace the immediate actions that a competent person considers necessary when danger is identified.

In this guide 5 sections
  1. Distinguish safety decisions from purchase decisions
  2. Describe the work before authorising it
  3. Keep changes visible during delivery
  4. One purchase order for repairs and an unresolved investigation
  5. Close the finding with appropriate evidence
Keep a copy

Read the guide offline or copy its planning points into your own records.

Download this guide as text
01

Distinguish safety decisions from purchase decisions

Agree an urgent communication route before the inspection. A finding indicating immediate danger should reach someone who can coordinate the appropriate safety response; it should not sit in an ordinary quotation queue. The competent people involved determine safe electrical actions. For subsequent work, identify which decisions require technical clarification, operational approval or purchasing authority. One person may hold several roles, but naming the roles helps prevent a budget approval being mistaken for permission to interrupt a critical supply.

02

Describe the work before authorising it

A remedial instruction should identify the original observation, its location and the proposed work. Ask the contractor to distinguish confirmed repair work from investigation needed to establish the cause or extent. If a quotation assumes access, replacement equipment or a shutdown, record those dependencies. Compare proposals against the same finding references; otherwise a cheaper proposal may simply address less work. Keep any recommendation that is outside the authorised scope visible for a later decision rather than allowing it to disappear.

Authorisation stageDecision and authority requiredEvidence supporting the decision
Urgent routeName a person able to receive and coordinate immediate safety information.Contact details covering the actual visit period.
Technical reviewClarify the finding and any investigation dependency before scoping repair.Original observation and competent clarification.
Commercial approvalIdentify the budget holder and permitted authorisation limits.A written instruction linked to the quotation.
Operational releaseAgree who can approve access and interruption for the proposed work.Site approval and equipment dependencies.
ClosureDefine the evidence needed to confirm what was completed.Linked certification or records appropriate to the work.
03

Keep changes visible during delivery

Use a short variation route for conditions discovered during work. The technician should know who can approve a changed scope and what happens if that person is unavailable. The client should understand whether a pause affects safety or merely the planned programme. Record the reason, additional instruction and approval before treating a changed job as part of the original order. Avoid collecting unnecessary sensitive information in photographs or notes; evidence should explain the installation and work, not unrelated site activity.

Practical checklist
  • Keep urgent safety escalation outside the ordinary purchase-order waiting list.
  • Ask whether the quoted work resolves the finding or first investigates it.
  • Record exclusions and decisions to defer work with a responsible owner.
  • Check completion evidence against each authorised observation reference.
04

One purchase order for repairs and an unresolved investigation

In a hypothetical premises, the report identifies defined repairs and a separate condition requiring investigation. A budget holder raises an order for “all EICR remedials”. That wording leaves the contractor unsure whether it may proceed with whatever repair the investigation later suggests.

Separate the instruction into defined work and an investigation with a stated purpose. Ask what evidence the investigation will provide, who reviews it and how any subsequent repair will be approved. The site must also know which interruption has been authorised; permission to investigate one area is not an open release of every affected service. Keep the investigation action open after its first attendance until the findings have been reviewed. The budget holder can then approve a specific next scope, supported by evidence, instead of being asked to endorse an unknown package retrospectively.

05

Close the finding with appropriate evidence

Choose completion evidence appropriate to the work actually undertaken and obtain competent advice where required. An invoice describes a commercial event. A photograph may show a replaced item but not every relevant test result. Link the applicable certification, test record or other evidence to the original finding, and check that any unresolved investigation remains open. Do not overwrite the initial report to make the action list appear clean. A useful closure record lets a later reviewer understand both the original concern and the basis for closing it.

Related questions

Several services questions.

Does paying the invoice close the observation?

No. Review the evidence appropriate to the work and link it to the finding. Payment and technical closure are separate decisions.

Can the inspection supplier also quote the work?

That can be agreed. Preserve the original findings, request a clear scope and evaluate the proposal against the evidence rather than assuming inspection automatically authorises repairs.

Research & further reading

Sources used for this guide.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. HSE: Electricity at work — safe working practices ↗

    Safe systems of work, isolation and electrical permits. Planning guidance is not an instruction to carry out electrical work.

  2. Reaction Group: Terms and conditions ↗

    Published service scope and EICR limitations, including access, records, additional work and agreed extent. Confirm the terms supplied with the actual quotation.

  3. HSE: Using contractors ↗

    Contractor selection, risk information, coordination and supervision. The practical document suggestions in this article are editorial recommendations.

Inspection service

Several services: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request several inspection services

Share the relevant site information and the decisions still to be agreed. Reaction Group can scope the proposed service and confirm the arrangements in a quotation.