Emergency light testing for public buildings.
Retain asset-level evidence across venues with different opening and access patterns.

Arrange emergency light testing
around your public-sector & civic estates.
Public-building lighting programmes need to distinguish each premises’ assets and operating arrangements. Provide site and luminaire references, available test records and the planned testing scope. Libraries, public counters, depots and community venues may have very different access windows, with booked events or essential services continuing outside normal office hours. Agree any operational and recovery precautions with the local manager rather than choosing a single estate-wide time by assumption. The records should identify tested locations, failures and unavailable assets so remedial instructions remain traceable. A central dashboard can help show progress, but it should lead back to the evidence for each building. Testing is not an approval of every escape route or the whole public estate’s fire arrangements.
Know what the
service covers.
Functional and duration testing of emergency lighting. Agree testing and battery-recharge arrangements around occupancy, then receive recorded results and identified defects.
View the complete Emergency light testing serviceAgree how the findings
reach your team.
- Identify the fittings, locations, test method and results within the agreed scope.
- Record failed or unavailable units and any limitations affecting test coverage.
- Agree the handover for repairs, retesting and any operating arrangements needed during recharge.
Questions before you book
Can every site be booked outside office hours?
Check public activities, events, security and essential services at each building before fixing the work window.
Is an estate completion percentage enough?
Keep the underlying location, failure and exception records so the figure can be checked and acted on.
Tell us about
the premises.
Specify the buildings, services and reporting required under the instruction. Other statutory inspections and public-estate responsibilities remain separately defined.
Planning references
- HSE: Using contractors (INDG368) ↗Great Britain
- Home Office: Offices and shops fire-risk assessment ↗England landing-page scope
- Home Office: Small/medium places of assembly fire-risk assessment ↗England landing-page scope
Request emergency light testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
Handing over commercial inspection records when property responsibility changes
Hand over an indexed record of the installations and services concerned, current reports, unresolved findings and relevant maintenance information.
GUIDE · 4 MIN READPlanning emergency lighting tests around building operation
Define test scope, occupancy constraints, recharge arrangements and follow-up for a managed building.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request emergency light testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
