Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Commercial inspection programmes

EICR and PAT testing.
Two scopes. One site plan.

Coordinate fixed-wiring inspection and equipment checks without confusing what either service covers. Agree asset lists, isolation permissions and the separate records you need.

Commercial inspection planning illustration
Inspection programme illustration
Define the programme

Fixed wiring and portable equipment
need different inspection scopes.

The EICR instruction concerns the agreed fixed electrical installation. PAT and equipment-maintenance work concern the equipment included in the register and the methods appropriate to it. A desk count, room count or single floor-area figure does not describe both scopes. Provide board schedules and circuit estimates alongside the equipment categories, quantities and ownership boundaries.

Agree which business systems can be interrupted and who approves isolation and reinstatement. Some equipment may need manufacturer information or specialist support. Keep missing equipment, inaccessible parts and separately authorised repairs visible in the appropriate record instead of presenting the whole building as a single completed check.

SERVICES TO SPECIFYEICR testingPAT testing
Plan the work

Agree the scope,
attendance and handover.

01

Installation information

Identify the distribution boards, circuits, previous EICR and landlord-controlled electrical areas.

02

Equipment information

Describe the appliances, leads, specialist items and unavailable or off-site equipment.

03

A coordinated working window

Agree permissions and shutdown/restart responsibility, then confirm the separate report and equipment-register handovers.

A practical site schedule

Put the property details
in one working list.

The site planner creates a reusable schedule for the services and access arrangements you know about. Unknown technical quantities can be clarified in the enquiry.

QUOTE ENQUIRY

Arrange electrical and fire inspections.

Start with the work required. Add your premises, access and preferred dates in the enquiry.

Prefer to call? 0203 885 2299
Before you enquire

Questions about combined inspections

Does a satisfactory EICR replace PAT?

An EICR concerns the fixed installation. It does not describe the maintenance condition of every appliance or replace an equipment-maintenance plan.

Do all appliances require an annual test?

Do not assume a blanket annual interval. Equipment type, use, environment, maintenance information and previous findings inform an appropriate approach.

Can equipment repairs be included?

Identify any requested repair scope and how it will be authorised. Do not assume every fault or specialist item is included in the testing instruction.

Talk to Reaction Group

Plan the inspections
your buildings need.

Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.

Request an inspection quote0203 885 2299
Call the teamGet a quote