Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Functional tests, duration tests & occupied premises

Emergency lighting
test scheduling.

Need evening or weekend access? Request a suitable testing window and include building occupancy, affected areas and battery recharge in the plan.

Attendance and the safe testing arrangements are subject to the system, agreed scope and availability.

Illustration of a facilities team reviewing emergency-lighting arrangements along an evening stair route.
Testing is part of the operating plan

Out-of-hours tests:
plan for battery recharge.

After a duration test, batteries need to recover. Consider what would happen if normal lighting failed during testing or before the emergency system has sufficiently recharged.

BEFORE

Identify occupancy and the system.

Explain how the building is used, which areas remain occupied and which escape routes or activities could be affected. Make relevant system information, test facilities and existing records available.

DURING

Follow the agreed test method.

Confirm whether functional or duration testing is required and how results and faults will be recorded. The appropriate test is determined by the system and applicable requirements, not simply the length of a convenient appointment.

AFTER

Plan recovery and follow-up.

Account for the system’s recharge requirements, any defective units and the safe use of affected areas. Do not assume the whole premises can be treated as fully ready as soon as the test finishes.

Functional or duration testing?

Start with the test
your premises needs.

A functional test and a duration test establish different things. Explain the existing programme, available records and any overdue tests or defects. If you are unsure, ask for help establishing the correct scope before agreeing the visit.

There is no single duration or recharge time stated here for every emergency lighting system. Use the applicable system information, requirements and competent advice when planning the work.

Working outside normal opening hours may be useful, but a night visit can be unsuitable if staff or guests still rely on the affected escape arrangements. Give the actual occupancy pattern, not only the office opening hours.

Occupied and continuously operating buildings

Who is still using
the premises?

Describe the people and activities that remain after the main working day.

Hotels & sleeping premises

Account for guests, residents, staff and relevant escape arrangements during testing and recharge.

Night shifts & operational sites

Identify occupied areas, work activities and the contacts who can authorise the agreed arrangements.

Several buildings

Plan the programme by site. Different systems, opening hours and local conditions can need different testing windows.

Results & defective equipment

Keep the result
and the response together.

Agree the location references and test records your team needs. A failed or uncompleted test should be identifiable, with the affected equipment and recommended follow-up recorded appropriately.

Tell the team about faults already known before the visit. Testing, repairs, replacement and any verification are separate scope questions. A test record is useful only if the responsible organisation understands what still needs attention.

Include these details in the enquiry

  • Premises use and occupied hours
  • System information and previous records
  • Requested test type and estimated light count
  • Known faults or unavailable areas
  • Access, recharge and reopening constraints
Before you enquire

Emergency lighting test scheduling questions.

Can I request an evening or weekend visit?

Yes. Give the usable hours, occupancy and required testing in the enquiry. Suitable attendance and safe testing and recharge arrangements need confirmation; an out-of-hours appointment is not automatically guaranteed.

Can all duration tests be booked for the end of the day?

That depends on the system and how the building is occupied afterwards. Consider the risks during testing and battery recharge, including a possible failure of normal lighting.

Will an EICR include these tests?

Do not assume so. Fixed-wire inspection and emergency lighting testing serve different purposes. Name each required service and confirm its scope and records in the quote.

Can you replace failed lights during the visit?

Explain the known defects and requested support. Repairs or replacements, authorisation and any further testing need an agreed scope; they should not be assumed to be included in the test price.

Detailed explanations

Related guides & explanations.

Use the detail to prepare your site information and questions for the team.

Quote enquiry

Discuss emergency lighting test times.

Add the required test, premises use and preferred working window. Include any occupancy or recharge constraints in the full enquiry.

Discuss testing times & accessPrefer to talk? 0203 885 2299
Call the teamGet a quote