RG Connect customer portal
Sign in to find visits, inspection reports and certificates for the properties linked to your account.

Find the right site and report.
Start with the site address and inspection date. For a building inspected in phases, check the extent of the report before using it to answer a question about a particular distribution board.
Site records
Use the portal to review past or upcoming visits and download available documents for your sites. Keep urgent observation notifications with the relevant job and follow your agreed escalation arrangements.
Distribution board schedules
Where a board has an RG Connect QR label, it links the board to its schedule. Match the board reference in the schedule to the one on the report before passing an observation to your contractor.
See how an EICR is set out.
These two sample reports show the recorded inspection extent, findings and schedules. Use the form edition printed on your own report when looking up an observation.
Commercial EICR sample
A 25-page example using the form headed BS 7671:2018+A4:2026.
Open the 25-page sample EICR (PDF)January 2026 sample
A 23-page industrial and commercial example using the earlier form headed BS 7671:2018+A2:2022.
Open the January sample EICR (PDF)Need help finding a report?
Give Reaction the site address, your organisation name and the date or job reference if you have it. Leave passwords and sign-in codes out of the enquiry.
Call Reaction on 0203 885 2299Have a report with outstanding observations?
Gather the observation numbers, board references and records of any work already completed. These details help the team discuss what needs attention next.
Discuss findings from an existing EICR