Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Electrical testing · Question explained

How to read a remedial quotation after an EICR

Once an EICR identifies issues, the next document is often a repair quote. That is where technical findings become a purchasing decision.

Request an EICR quote
The short answer

What should an EICR remedial quotation explain?

It should link each proposed task to the relevant observation, explain its purpose, distinguish safety repairs from advisory improvements and state access, isolation and verification needs. Ask what completion evidence is included and how further discoveries are handled. A broad replacement description is difficult to assess without a clear connection to the report.

A useful proposal should let the client understand what will change, which observation it addresses and what evidence will show completion. It should also separate work needed for the reported safety conditions from optional improvement or capacity upgrades. This article explains how to assess that proposal without attempting to redesign the installation yourself. The goal is a clear, traceable scope that a competent contractor can deliver and a facilities team can review.

In this article 5 sections
  1. Start with the original observations
  2. Link proposed work to an outcome
  3. Separate investigation, repair and improvement
  4. Check operational requirements and exclusions
  5. Specify evidence and closeout
01

Start with the original observations

Use the full EICR, not a list of codes copied into an email. Check the defect description, location, board or circuit and any immediate action. Ask the inspector to clarify wording that is too vague to locate the problem or understand its significance.

Read the report’s edition and guidance. Under A4:2026, C1/C2 determine an unsatisfactory result, while C3 and FI are advisory. That distinction helps prioritise, but does not replace the need to understand the finding. FI may require a separate investigative scope before a suitable repair can be specified.

Create a comparison table with one row per observation and columns for each contractor’s proposed response, exclusions and completion evidence. Include a separate row for any recommended wider upgrade. This reveals whether offers address the same findings and avoids comparing a targeted repair with a broader renewal package as though only the totals differ. Ask about any observation left without a clear response.

02

Link proposed work to an outcome

Ask for each quote item to identify the observation addressed and the intended result. If several observations are resolved by one task, the relationship should be explained. If a broad replacement is proposed, ask why that option is suitable and whether alternatives have relevant limits or advantages.

In a hypothetical commercial unit, replacement of distribution equipment may be offered alongside repairs to damaged accessories. The quote should distinguish what each task addresses. Do not assume that a new board resolves every defect elsewhere in the installation, or that a modernisation proposal is automatically necessary because an older item appears in the report.

03

Separate investigation, repair and improvement

Some work establishes the cause or extent of an issue; some corrects an identified defect; some improves an installation beyond that immediate correction. Keep those purposes visible in the scope and price structure. This makes it easier to decide what must happen promptly and what can be planned within a wider project.

Ask how investigative findings will be reported and how further work will be authorised. A quotation should not pretend to know a hidden fault’s full repair scope without sufficient evidence. Equally, an investigation allowance should have a defined task and output rather than an open-ended instruction to do whatever is necessary.

04

Check operational requirements and exclusions

Identify affected circuits, shutdown needs, specialist attendance, access and restoration checks. Confirm responsibility for moving equipment, obtaining permissions and dealing with any site-specific hazards. The repair method and interruption plan may differ from the inspection visit’s arrangements.

Read exclusions carefully. Decorating, making good, additional identification, service-provider work and further inspection may or may not be included. Do not infer them from a headline description. A good quote says what completion means and leaves the client able to coordinate related tasks without discovering the gaps when the work is already underway.

05

Specify evidence and closeout

Ask what appropriate certification, test results or other records will be supplied for the actual work. Link them back to the original report and maintain an action register. Agree whether any further inspection or new report is needed; repair and a fresh condition assessment are not automatically the same commission.

When comparing repair offers, give each contractor the same complete report and related information. Compare the resulting scope, evidence and operational assumptions alongside price. A cheaper number does not help if it leaves one of the relevant defects unresolved or removes the verification needed to demonstrate the work’s outcome.

Practical checklist
  • Quote items identify the relevant EICR observation references.
  • Urgent repairs, investigations and advisory improvements are distinguishable.
  • Proposed replacements have an explained technical purpose.
  • Access, shutdown and specialist dependencies are assigned.
  • Additional discoveries have a defined communication and approval route.
  • Suitable completion evidence and any further assessment are specified.
Related questions

EICR testing questions.

Does every C3 recommendation need to be in the urgent repair package?

C3 is advisory. Consider the improvement and its context, but distinguish it from urgent safety work. Ask the competent contractor to explain the practical benefit and timing.

Can a repair invoice be the only closure evidence?

An invoice may describe work but should not be assumed to provide all necessary electrical verification. Agree suitable evidence for the task and link it to the original finding.

Research & further reading

Sources used for this article.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. IET: BS 7671:2018+A4:2026 EICR model forms ↗

    Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.

  2. IET Wiring Matters: Further Investigation, July 2026 ↗

    Explains the A4:2026 change: C1/C2 determine an unsatisfactory outcome; C3 and FI are advisory. FI still calls for a reasoned investigation response.

  3. HSE HSG85: Electricity at work, safe working practices ↗

    Supports planning, competence, safe systems of work, isolation and control of work on electrical systems.

Inspection service

EICR testing: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request an EICR quote

Identify the report observations and operational restrictions so proposed work and suitable completion evidence can be made clear.

No contact details needed for these first questions.Prefer to talk? 0203 885 2299
Call the teamGet a quote