Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Existing commercial EICR reports

Unsatisfactory EICR?
Start with the findings.

Discuss the observations in your existing report, the affected circuits and any repairs already completed. Agree whether the next step is investigation, remedial work or a defined follow-up inspection.

Have a report but unsure of the outcome? Bring the wording and edition into the conversation.

Illustration of an electrical inspector and facilities contact reviewing an existing report and circuit schedules.
From report to instruction

A finding needs a response.
A new inspection needs a reason.

A “failed EICR” is often shorthand for an unsatisfactory report. The useful starting point is the actual observation, its classification, location and recommended action.

01 / READ

Identify the observation.

Keep the description and code together. Note the distribution board, circuit reference, stated limitation and any photographs. A short defect list can lose the context needed to price the correct work.

02 / DEFINE

Separate investigation from repair.

An observation may identify a repair or a need to establish more information. Ask what is known, what remains uncertain and what access or isolation will be needed before agreeing an instruction.

03 / RECORD

Agree the evidence afterwards.

Confirm which completion records, test results or certification are appropriate to the work. Keep them with the original EICR so your team can see the finding and the recorded response.

Classification & urgency

Use the code.
Read the words beside it.

Under BS 7671:2018+A4:2026, C1 and C2 observations determine an unsatisfactory outcome. FI and C3 do not themselves make the overall result unsatisfactory.

Historic reports may use an earlier edition and different recipient notes. Keep the report’s date and edition attached; a new wording convention does not rewrite an earlier inspection.

Read the EICR code guide
C1
Danger presentImmediate action is required. Follow the report and competent safety advice.
C2
Potentially dangerousUrgent remedial action is required.
FI
Further investigation advisedEstablish what the observation needs under the edition used.
C3
Improvement recommendedReview the recommendation and plan any agreed work.
Prepare the report discussion

What does your
existing EICR say?

You do not need to interpret every technical result before enquiring. Start with the report you have and the person responsible for arranging the work.

  • Report date, edition and overall result
  • Observations, codes and circuit locations
  • Scope, limitations and inaccessible areas
  • Any investigation or repair already completed
  • Opening hours, critical equipment and access contacts
Existing report enquiry

Start with the
report status.

The enquiry prepares the brief. Report documents and the final scope can be discussed with the team.

Commercial remedial work

Price the defined work.
Keep the original report.

A remedial quotation should identify the observations it addresses, the work included and any assumptions. Establish whether investigation, access equipment, isolation, reinstatement or follow-up testing are separately scoped.

If another contractor has already carried out repairs, include the records you received. The next engineer needs to understand the completed work and any remaining uncertainty; the words “all fixed” do not establish the condition of every circuit.

Does every unsatisfactory report need a full retest?

The response depends on the observations, inspection limitations and completed work. A new full EICR should not be assumed solely because an earlier report was unsatisfactory. Agree what needs to be investigated, corrected or verified.

How to review an EICR remedial quote →
Before you enquire

Existing EICR questions.

Can I ask about a report prepared by another contractor?

Yes. Explain who prepared it, its date and the findings you want to discuss. The team will need the relevant records and a clear scope before confirming what assistance is appropriate.

Can you give a repair price from the code alone?

A code describes the significance of an observation, not the full work specification. The description, affected equipment, access and any investigation required are needed to establish a useful quotation.

What if the report identifies an immediate danger?

Follow the report’s urgent safety advice and contact a competent person through an appropriate immediate response route. This quote enquiry does not arrange emergency attendance or make equipment safe.

Will a new certificate automatically cancel the old EICR?

Keep the EICR with the records of work that followed it. The appropriate documentation depends on the work undertaken; agree this before placing the order rather than assuming every repair produces a replacement EICR.

Detailed explanations

Related guides & explanations.

Use the detail to prepare your site information and questions for the team.

Quote enquiry

Discuss the findings in your EICR.

Add the premises, report status and access arrangements. Keep any existing findings and completion records available for the conversation.

Discuss an existing EICRPrefer to talk? 0203 885 2299
Call the teamGet a quote