What is the difference between an EICR and PAT?
An EICR assesses the condition of the fixed electrical installation within an agreed scope. PAT is a common term for inspection and testing of electrical equipment as part of its maintenance. One does not replace the other: the wiring and socket supplying a device present different assessment questions from the device, its lead and its plug.
The answer sits at the boundary between the building’s installation and the equipment connected to it. Both can develop defects, and they need different evidence. Understanding that boundary helps you order the right work and avoid a collection of documents that leaves a significant gap. This article explains the distinction for commercial premises without treating either service as a universal certificate for everything on site.
In this article 5 sections
Follow the electricity through the boundary
The fixed installation includes distribution equipment, circuits and accessories such as socket outlets within the report’s agreed extent. The EICR records an assessment of its condition for continued use. It relies on inspection and appropriate testing by competent people and must be read alongside its schedules and limitations.
Equipment maintenance concerns the appliances and associated items used by the business. A plugged-in floor cleaner, its flexible lead and plug are a different assessment task from the circuit supplying the socket. Detachable leads, chargers and extensions should be considered explicitly so the space between the two scopes is not overlooked.
When drawing the boundary, use an ordinary room as a practical example. List the distribution circuit and socket under installation records, then list the plugged-in devices and accessories under equipment records. Add any specialist system separately. This small exercise often reveals why one service reminder cannot answer every electrical question, and helps colleagues route a reported defect to the right team.
| Item or question | Appropriate scope to clarify |
|---|---|
| Socket outlet and supplying circuit | Fixed-installation assessment. |
| Plugged-in floor cleaner and flexible lead | Equipment maintenance assessment. |
| Detachable mains lead or extension | Equipment component identification and maintenance. |
| Emergency-lighting function and duration | Separate specialist system arrangements. |
Understand what each result can establish
A satisfactory EICR does not demonstrate that every appliance connected afterwards is safe. A damaged kettle lead can remain dangerous even when the installation supplying it has been assessed. Conversely, a passed appliance does not demonstrate that the socket, circuit protection or fixed wiring has been assessed for continued use.
In a hypothetical meeting room, an extension lead is trapped beneath a table while the socket circuit is in sound condition. Equipment inspection may identify the damaged lead; the EICR answers a different question. The business needs both the defect response and a sensible maintenance plan, not an argument over which label should cover the room.
Avoid the two calendar myths
Great Britain’s Electricity at Work Regulations require maintenance to prevent danger, so far as reasonably practicable. They do not prescribe annual PAT for all equipment or a single five-year EICR timetable for every commercial installation. Suitable arrangements depend on the installation or equipment, its conditions of use and competent advice, alongside any specific applicable requirements.
That flexibility requires decisions rather than guesswork. A low-risk office and a demanding workshop need not have identical equipment maintenance arrangements. An installation’s next inspection recommendation should be considered in context. Check any sector, tenancy, licence or insurance conditions separately rather than describing them as one universal electrical law.
Keep specialist systems visible
Fire alarms and emergency lighting have specialist inspection and maintenance needs beyond an ordinary EICR or PAT package. The fixed supply to such systems may be within the installation scope, while their functions and performance require separate attention. Machinery and specialist equipment can create similar interfaces.
Ask each quotation to describe included systems and exclusions. A broad heading such as complete electrical testing is not enough to establish that every relevant task is covered. The useful output is a map of responsibilities and evidence: which installation, which equipment population and which specialist systems are being assessed, by whom and with what records.
Order the work around your actual gaps
Start with the evidence you have. Check the EICR’s covered boards and supplies, the equipment register’s current status and the specialist maintenance records. Identify missing areas, alterations and equipment that has moved or been repaired. Then commission the work needed to address those gaps and establish a proportionate continuing plan.
For a larger site, a coordinated programme can share access and communications while retaining distinct technical records. This often makes the management task easier without pretending that the two assessments are interchangeable.
- Installation scope names the buildings, boards and relevant circuits.
- Equipment scope includes relevant leads, chargers and extensions.
- Specialist systems have clearly assigned assessment arrangements.
- Existing records and known defects reach the right assessor.
- Shutdowns and equipment availability are coordinated.
- Findings and exceptions have owners after the visits.
Several services questions.
Can a PAT label prove a socket is safe?
No. It relates to the identified equipment and assessment, not a condition report for the socket circuit or the wider fixed installation.
Should a new business book both immediately?
Review the premises, equipment and available records with competent advice. New occupancy is a useful review point, but the appropriate scope depends on what exists and what evidence is reliable.
Find the relevant service details, access considerations and information to include in an enquiry.
Find inspection advice for your industry →Find your site area →Prepare a site inspection list →Sources used for this article.
The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.
- The Electricity at Work Regulations 1989 ↗
Great Britain: duties concerning safe systems, maintenance, isolation and competence. It does not set a universal annual PAT or five-year commercial EICR timetable.
- IET: BS 7671:2018+A4:2026 EICR model forms ↗
Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.
- HSE HSG107: Maintaining portable electrical equipment ↗
Supports equipment maintenance using user checks, formal visual inspections and appropriate tests, with decisions based on use, environment and findings.
- IET Wiring Matters: EICR myths ↗
Supports assessment of existing installations and distinctions between installation reporting and specialist systems. Historic FI wording must be read alongside the 2026 update.
Several services: scope & records.
See what the service includes and which site details help prepare a relevant quote.
View the service details