Electrical testing · Question explained

How often should a commercial installation have an EICR?

A reminder saying EICR due is useful only if the date has a sound basis. Commercial premises vary from quiet offices to demanding workshops, and their installations do not deteriorate or change in identical ways.

Request an EICR quote
The short answer

How often should a commercial EICR be carried out?

Use a competent, installation-specific recommendation informed by condition, use, maintenance and external influences, alongside any applicable sector or contractual requirements. The Electricity at Work Regulations do not set one five-year period for every commercial site. Review the previous report’s recommendation and reassess the plan when damage, faults, alterations or operating conditions change.

The next inspection interval should reflect those differences and the maintenance arrangements between reports. This article explains who recommends the interval, what evidence to use and when to review it early. It avoids turning a familiar five-year figure into a universal law or treating a future recommended date as permission to ignore damage that appears in the meantime.

In this article 5 sections
  1. Establish where the recommendation came from
  2. Consider the installation and how it is used
  3. Distinguish periodic assessment from ongoing maintenance
  4. Identify events that justify an earlier review
  5. Keep specific obligations alongside the technical plan
01

Establish where the recommendation came from

Find the complete previous report and check the next-inspection recommendation, its reason and the installation covered. A date label at a board is a useful prompt, but cannot explain exclusions, findings or the basis of the recommendation. If the record is missing, discuss the gap with a competent person rather than inventing its history.

The IET explains that the designer recommends the initial inspection interval for a new installation, while the competent inspector recommends subsequent intervals. Its guidance on initial frequencies is recommendatory, not a universal legal timetable. The site should retain the reasoning so a later manager can understand why the date was chosen.

02

Consider the installation and how it is used

Relevant factors include the installation and equipment, use and operation, maintenance quality and external influences. Supply the inspector with fault reports, alteration records and information about the actual environment. Describing a building simply as commercial leaves out much of what matters.

A protected office installation and an installation exposed to mechanical damage or moisture present different conditions. Even two offices can differ because one has reliable maintenance and controlled alterations while the other has incomplete records and repeated defects. Do not assign the interval solely by matching a business label to a number found online.

03

Distinguish periodic assessment from ongoing maintenance

An EICR records condition at a particular time and extent. Electrical maintenance continues between reports. Suitable routine observations, defect reporting and appropriate response help identify deterioration or damage before the next planned periodic assessment. HSE's guidance treats inspection and necessary testing as elements of preventive maintenance, with experience informing adjustment.

Give staff a way to report damaged accessories, unusual overheating or recurring trips without attempting diagnosis or repair beyond their competence. Seek competent attention when concerns arise. A satisfactory report does not guarantee future condition, and an inspection date several years away should not become a reason to defer a current safety question.

Maintenance layerPurpose
Periodic condition assessmentReview the installation at an appropriate planned interval.
Routine attention and defect reportingNotice changes between periodic assessments.
Event-driven reviewRespond when damage, use or maintenance conditions change.
Action trackingEnsure findings lead to suitable restrictions or completed work.
04

Identify events that justify an earlier review

Changes in use, substantial alterations, water damage, fire, repeated faults or a breakdown in maintenance information can justify reviewing the plan. The appropriate response depends on the event. It may involve immediate restrictions, a targeted investigation, verification of new work or a wider condition assessment.

For a hypothetical unit converted from storage to a busy workshop, the old calendar date may remain printed on the label while loads and operating conditions have changed. Ask a competent person what assessment and design work the change requires. Do not assume either that every change demands a full new report or that the previous recommendation automatically remains suitable.

05

Keep specific obligations alongside the technical plan

Check the premises jurisdiction, sector, lease, licence and relevant contractual conditions. Record the applicable requirement and its source separately from the inspector's condition-based recommendation. If the two differ, obtain clarification and coordinate a plan that addresses the actual obligations and risks.

Book the work with enough lead time to arrange access and necessary isolation. An interval decision has little value if the business repeatedly reaches the planned date without the permissions or operational support needed to assess the relevant installation.

Practical checklist
  • Previous report, extent and next-inspection reasoning are available.
  • Actual use, environment and maintenance findings reach the inspector.
  • Defects have an immediate reporting and response route.
  • Changes and incidents trigger a competent review when appropriate.
  • Sector and contractual conditions are checked rather than assumed.
  • Dates and reasons remain visible to the next responsible team.
Related questions

EICR testing questions.

Is five years always the legal limit for commercial premises?

No blanket five-year limit appears in the Electricity at Work Regulations for every commercial installation. Specific premises, sector or contractual conditions may impose requirements that need separate checking.

Can we extend the date because the last report was satisfactory?

Do not assume that is sufficient. Seek competent advice using the actual installation, maintenance evidence, operating conditions and applicable requirements, and record any revised decision and reasoning.

Research & further reading

Sources used for this article.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. The Electricity at Work Regulations 1989 ↗

    Great Britain: duties concerning safe systems, maintenance, isolation and competence. It does not set a universal annual PAT or five-year commercial EICR timetable.

  2. IET: Inspection and testing FAQs ↗

    Explains that the designer recommends the initial interval and the competent inspector recommends subsequent intervals, considering installation, use, maintenance and external influences. Initial guidance intervals are recommendations, not universal legal requirements.

  3. HSE HSR25: Guidance on the Electricity at Work Regulations ↗

    Regulation 4 guidance, paragraphs 66–70: maintenance to prevent danger, inspection and testing in preventive maintenance, adjustment using experience, and records as useful evidence and monitoring tools.

  4. IET: BS 7671:2018+A4:2026 EICR model forms ↗

    Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.

Inspection service

EICR testing: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request an EICR quote

Describe the premises, existing report recommendation and any changes in use or condition so the next assessment can be scoped appropriately.