What inspection information should be entered into a CAFM system?
Record enough information to identify the installation, locate the issued report and track each relevant action without changing its meaning. Keep report references, observation identifiers, limitations and completion evidence linked. Confirm any export or import capability before planning automation. A CAFM task is a management record; the original inspection report remains essential technical evidence.
A useful CAFM handover starts by deciding what the receiving system needs to preserve. This article offers a practical field map for facilities teams. It does not assume Reaction Group connects to a particular CAFM product, provides a particular API or supports an automatic import. Those capabilities, formats and permissions must be checked before they form part of the delivery plan.
In this article 5 sections
Map meaning before mapping columns
Start with the questions a maintenance coordinator must answer: which installation, which observation, what decision and what evidence? Define those concepts before opening an import template. A field called “status” can mean inspection attendance, report assessment or remedial progress, depending on the system. Keep those meanings separate. Preserve the original observation text or a controlled link to it, and identify summaries as summaries. A shortened task title should not become the only surviving description of a technical finding.
Use stable identifiers
Use the client’s stable site reference alongside the supplier’s report reference. Where an observation concerns a board or circuit, retain the identifier as issued and map it to the asset register carefully. Do not force a match to a similarly named asset without checking. If the installation records need reconciliation, make that a visible task. Agree how photographs and supporting files will be linked where supplied, and confirm who retains access to them after a contract or portal account changes.
| CAFM field or link | Meaning to preserve | Mapping check |
|---|---|---|
| Site identity | Use a stable property reference alongside the address. | A checked supplier-to-client site mapping. |
| Report identity | Preserve the issued reference, date and version. | A durable link to the complete report. |
| Observation identity | Keep the finding reference and installation location intact. | A source-linked maintenance action. |
| Workflow status | Separate visit, report and remedial states. | A documented meaning for each status. |
| Closure evidence | Link the action to relevant completed-work records. | An auditable finding-to-evidence trail. |
Test a small handover before scaling it
Run a small end-to-end test using a sample report and a realistic action. Check that the receiving system can hold the required characters, references and document links. Ask a coordinator to assign the work and a reviewer to find the original evidence. If an export is agreed, test the actual format rather than a hypothetical spreadsheet. Keep permissions appropriate to the users and avoid importing unrelated personal or sensitive site information simply because it appears in a source file.
- Test an actual report pack before committing to an import process.
- Confirm export capability and file format with the supplier directly.
- Keep limitations visible where they affect the action or evidence status.
- Check that users can open linked records after the original uploader leaves.
Two sites both have a board called DB1
In a hypothetical CAFM import, observations from two premises carry the board name DB1. The import maps the location text but drops the stable property reference. The upload succeeds, leaving a maintenance coordinator unable to tell which installation a task concerns.
Stop the wider import and fix the site mapping before creating more ambiguous records. Retain the supplier’s report and observation identifiers, then have another coordinator locate an imported finding and its original document without help from the uploader. Test assignment and closure as well as upload. If the source information needs clarification, resolve it rather than forcing a match to the nearest asset name. A successful transfer means that a later user can identify the right premises and evidence; the software’s confirmation that rows were accepted does not establish that.
Separate action closure from report editing
Close actions on the basis of appropriate completion evidence, not because the report was uploaded. Keep a link between the initial finding, authorised work and resulting records. A later inspection or authorised report revision should have its own identity rather than silently overwriting history. Review the data quality after the first batch: duplicate sites, broken links and lost observation references are easier to fix before a whole estate follows the same pattern. Useful records make later decisions traceable.
Facilities management questions.
Does RG Connect automatically integrate with our CAFM?
Do not assume that. Ask for confirmation of supported access, export and integration arrangements for the specific system and requirement.
Can a task summary replace the observation text?
A concise summary can help workflow, but preserve a reliable link to the original finding and its full context.
Find the relevant service details, access considerations and information to include in an enquiry.
Facilities-management providers: inspection planning →Find your site area →Prepare a site inspection list →Sources used for this article.
The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.
- Reaction Group: RG Connect for clients ↗
Public description of report access, site visibility and reporting tools. No third-party integration or export format is assumed.
- Reaction Group: Terms and conditions ↗
Published service scope and EICR limitations, including access, records, additional work and agreed extent. Confirm the terms supplied with the actual quotation.
- Reaction Group: EICR for facilities management ↗
Public description of FM support and nationwide delivery. This article does not create service-level promises.
Facilities management: scope & records.
See what the service includes and which site details help prepare a relevant quote.
View the service details