EICR support for FM providers.
Agree client data, access and escalation requirements before the first site visit.

Arrange EICR for facilities management
around your facilities-management providers.
An FM EICR instruction should connect the technical scope with the client contract’s reporting and access arrangements. Provide site lists, available board information, accepted limitations and the deadlines that matter to your team. Define the record hierarchy and any required CAFM fields with an example before assuming a standard report export will meet the need. Identify the client and local contacts who can authorise access, safe interruption and restoration. Keep urgent findings and missed-access escalation routes clear. The handover should retain the original premises report and a traceable record of exceptions and follow-up work. Portfolio consistency is useful, but it should not disguise a different installation boundary or unresolved issue at an individual client site.
Know what the
service covers.
EICR testing for facilities management contracts and property portfolios. Agree site access, inspection dates, reporting formats and defect escalation for each location.
View the complete EICR for facilities management serviceAgree how the findings
reach your team.
- Agree property, board and circuit identifiers with the client team.
- Confirm branding, report format and any client-specific data fields before work starts.
- Retain urgent escalations, inspection limitations and responsibility for follow-up.
Questions before you book
Can every CAFM system accept the same output?
No. Supply the required fields and a sample import format, then confirm what will actually be provided.
Does a portfolio summary replace individual EICRs?
No. Keep each premises report and its limitations available beneath the contract overview.
Tell us about
the premises.
Agree the reporting format, CAFM fields, escalation contacts and required dates before instruction. Include the client’s service-level requirements in the brief.
Planning references
- HSE: Using contractors (INDG368) ↗Great Britain
- HSE: Maintaining electrical equipment safety ↗Great Britain
- Home Office: Offices and shops fire-risk assessment ↗England landing-page scope
Request EICR for facilities management.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
Writing a multi-site inspection tender that suppliers can actually price
A useful tender defines the properties, installation boundaries, quantities, access conditions and reporting handover before asking for a price.
GUIDE · 4 MIN READBuilding an EICR programme around risk, access and decisions
Build the programme from verified inspection records, site responsibilities and operational constraints.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request EICR for facilities management
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
