How do you add EICR subcontract support to an active project?
Re-establish the current inspection scope, installation state and site controls before booking support. Identify what has changed since the original order, distinguish existing-installation inspection from new-work verification, and agree the report and customer handover. An active project needs a current instruction, not merely a forwarded tender document and a request to recover the programme.
Bringing in EICR support can help only if the testing team understands the installation it is being asked to assess. This article describes the handover needed when a project is already running. It does not promise recovery of a delayed programme or suggest that inspection support can replace the certification required for new electrical work. Use competent technical input to separate the different tasks and confirm the proposed instruction.
In this article 5 sections
Describe the installation as it is now
Create a current scope note showing areas available, areas still under construction and any installation changes since tender. Identify who controls the premises and how the inspection interfaces with other work. Give the testing team relevant drawings, previous reports and known issues, with version dates. An old document can still be useful if its limits are clear. The dangerous assumption is that the original tender remains an accurate description simply because it is the most complete file available.
Separate inspection from project verification
Clarify whether the request concerns an existing installation condition report, initial verification of new work or several separate deliverables. The IET distinguishes inspection and testing responsibilities and the competence required. Ask the appropriate technical people to define the task rather than treating “testing” as one interchangeable activity. A new circuit, an altered distribution arrangement and an untouched existing area may each require different consideration. Keep the boundaries explicit in the order and reporting plan.
| Live-project question | Current position to establish | Instruction or handover record |
|---|---|---|
| Current state | Identify completed, changing and unavailable areas. | A dated scope note and relevant drawings. |
| Task type | Separate condition reporting from new-work verification requirements. | A competent definition of each deliverable. |
| Site interface | Coordinate other work that may affect access or supplies. | A current site control and handover brief. |
| Change authority | Name who approves changed scope and operational interruption. | An available decision route. |
| Customer handover | Explain how the inspection pack joins the wider project evidence. | A final document index and query owner. |
Coordinate interfaces before attendance
Agree access, isolation and other site controls with the people managing the live project. Other trades may change conditions after the inspection team has been briefed. Define how handovers and changes are communicated, and identify who can approve disruption. HSE contractor guidance supports cooperation and relevant information exchange. A compressed programme is a reason for clearer interfaces, not a reason to skip them. If conditions are not ready, discuss a revised scope or sequence through the proper approval route.
- Tell the testing team what changed after the original enquiry.
- Ask competent people to define the required inspection and verification tasks.
- Check which drawings and instructions are current before mobilisation.
- Keep findings linked to the installation state and report issue actually assessed.
Existing areas and new circuits reach handover at different stages
A hypothetical refurbishment is nearing handover. The contractor asks for testing support, but the request combines untouched existing offices with new circuits that are still being completed. The latest drawing also shows an area not yet released by the site team.
Have the competent project and testing people separate the tasks and define the required evidence for each. Identify which areas are ready, who controls their release and how subsequent changes will be communicated. Send a current scope note alongside the relevant drawings, marking superseded information clearly. An EICR for existing areas should not be used as an unexplained substitute for verification of new work. The final customer index can bring the records together while preserving those different purposes. The handover then reflects the installation state actually assessed, rather than a broad request to “finish the testing”.
Hand over one current instruction
Issue a single current pack with an index, scope, contacts and open questions. Mark superseded instructions so the team does not choose between conflicting versions. Agree how findings will be reviewed alongside the project’s other outstanding work and who will explain the final pack to the customer. After the first inspection handover, resolve any recurring location or document issues before releasing more areas. The useful result is a clear evidence trail through a changing project, not a set of reports that cannot be reconciled with the final installation.
Contractor EICR questions.
Can an EICR replace certification for new work?
Do not treat the documents as interchangeable. Ask the competent electrical people to identify the verification and certification required for the actual work.
Should we send the original tender pack?
Send relevant original information with a current change note. The team needs to know what still applies and what has been superseded.
Find the relevant service details, access considerations and information to include in an enquiry.
Find inspection advice for your industry →Find your site area →Prepare a site inspection list →Sources used for this article.
The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.
- Reaction Group: EICR for electrical companies ↗
Public description of contractor and white-label support; individual delivery and branding arrangements require agreement.
- IET: Inspection and testing FAQs ↗
Competence and selection of periodic inspection intervals according to the installation and its circumstances.
- HSE: Using contractors ↗
Contractor selection, risk information, coordination and supervision. The practical document suggestions in this article are editorial recommendations.
Contractor EICR: scope & records.
See what the service includes and which site details help prepare a relevant quote.
View the service details