Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Commercial guide 4 min read

EICR programmes.Plan your estate.

Bring risk, site access and commercial decisions into one practical programme for your facilities team.

Illustration of a facilities planning desk with a model of several commercial sites and electrical testing equipment
One estate. A coordinated plan.REACTION / GUIDES
The short answer

How should an FM team build an EICR programme?

Build the programme from verified inspection records, site responsibilities and operational constraints. Separate the technical need for inspection from the practical booking date, then assign owners for access, reporting and follow-up. Use risk and available evidence to prioritise gaps; a uniform anniversary across every property is not a substitute for an installation-specific maintenance plan.

A calendar is the visible part of an EICR programme. The harder work sits behind it: checking which report belongs to which installation, understanding what was excluded, and finding someone who can approve the necessary interruption.

An orderly programme connects those tasks instead of treating each booking as a fresh enquiry. This guide is for facilities teams who need to turn a collection of properties into a manageable sequence of inspections. It does not prescribe a single inspection interval; the appropriate interval depends on the installation and its circumstances, alongside any applicable contractual or legal requirements.

In this guide 5 sections
  1. Establish a trustworthy starting point
  2. Keep separate dates for separate decisions
  3. Release sites in workable groups
  4. When a renamed building looks like a missing inspection
  5. Review evidence rather than attendance
Keep a copy

Read the guide offline or copy its planning points into your own records.

Download this guide as text
01

Establish a trustworthy starting point

Start by reconciling the property register with the reports actually held. A file named after a town may concern only one floor or a former occupier. Record the report reference, inspection extent, date, recommended next inspection and unresolved matters. The IET explains that subsequent periodic inspection intervals depend on factors including use, maintenance and external influences. Ask a competent person to review uncertainty; do not invent a new date merely to make a dashboard look tidy.

02

Keep separate dates for separate decisions

Keep the next inspection recommendation distinct from the planned appointment and the date evidence was accepted. These dates answer different questions. A postponed booking does not change the technical basis of the original recommendation. Equally, a completed visit does not prove that the commissioned extent was reached. A small set of separate fields makes programme conversations more honest, especially where access arrangements take longer than the inspection itself.

Programme fieldDecision it supportsRecord to check
Record identityMatch the report to an installation and current property reference.Report reference plus included area description.
Technical recommendationRetain the inspector’s recommendation and its context.The original report, not an overwritten date.
ReadinessConfirm permissions, isolations and local availability before booking.A readiness response from the site owner.
ExceptionsTrack limitations and missing evidence separately from completed visits.An exception register with responsible people.
Follow-upAssign remedial and investigation decisions after report review.A linked action list and closure evidence.
03

Release sites in workable groups

Group sites by the resources and permissions they need. Several nearby offices may be easy to schedule together; a continuously occupied premises may need an earlier planning lead even if its visit occurs later. Ask site teams to confirm readiness before the programme is released. Allow room for findings, restricted access and additional work without promising an arbitrary spare capacity. Escalate a safety concern through the agreed route immediately rather than waiting for the monthly programme meeting.

Practical checklist
  • Reconcile acquisitions and disposals before calculating the estate completion position.
  • Flag sites with no reliable report instead of manufacturing an assumed inspection history.
  • Ask each site to identify critical supplies and a person authorised to discuss disruption.
  • Review the reason for every deferred site at the next programme checkpoint.
04

When a renamed building looks like a missing inspection

Suppose an estate register lists North House, but the available EICR names the same address as the Administration Block. A recent extension makes the match uncertain. Booking another inspection immediately might duplicate part of the work without explaining whether the extension was ever included.

The programme owner should compare the report’s installation description and board references with current plans, then ask the site team about the name change and extension. Retain the old building name as a searchable alias. If the report covers the original block only, record that coverage and give the extension its own evidence question. Verified sites can continue through the programme while this one is reconciled. The resulting register should distinguish an administrative name change from a genuine inspection gap, preserving the original report and the reason for any new instruction.

05

Review evidence rather than attendance

Review the programme using four questions: what evidence is complete, what is incomplete, what action remains and who owns it? Keep inspection delivery and defect closure visible as different workstreams. Reaction Group’s FM service can be discussed in the context of the estate, but coverage, reporting arrangements and milestones should be confirmed for the actual instruction. A programme works when the next decision is clear, including at sites where the planned visit did not resolve every question.

Related questions

Facilities management questions.

Should every site use the same interval?

Not automatically. Installation use, condition, maintenance and external influences matter. Confirm the recommendation for each installation and any additional obligations that apply.

Is a booked inspection enough to close an overdue task?

A booking records a plan. Keep the task open in a suitable status until the agreed evidence has been delivered and reviewed.

Research & further reading

Sources used for this guide.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. IET: Inspection and testing FAQs ↗

    Competence and selection of periodic inspection intervals according to the installation and its circumstances.

  2. Reaction Group: EICR for facilities management ↗

    Public description of FM support and nationwide delivery. This article does not create service-level promises.

  3. HSE: Using contractors ↗

    Contractor selection, risk information, coordination and supervision. The practical document suggestions in this article are editorial recommendations.

Inspection service

Facilities management: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request multi-site EICR testing

Share the relevant site information and the decisions still to be agreed. Reaction Group can scope the proposed service and confirm the arrangements in a quotation.

No contact details needed for these first questions.Prefer to talk? 0203 885 2299
Call the teamGet a quote