Commercial guide 4 min read

Occupied offices.Plan around the working day.

Prepare electrical inspection access around the people, IT and activities that need to keep moving.

Illustration of an occupied office with desks, shared circulation space and a tablet prepared for inspection planning
Inspection planning for a working officeREACTION / GUIDES
The short answer

How can an occupied office prepare for an EICR?

Map the office’s electrical areas, business-critical equipment and realistic interruption windows before booking. Coordinate landlords, tenants, IT and local management where their responsibilities overlap. Agree staff communication, safe access and restoration checks, and record any area that cannot be released. Occupied-office planning should support a meaningful inspection without assuming that all work can happen around uninterrupted operations.

Offices can look low risk and still be awkward to inspect. A board may serve several floors, a communications cabinet may support another site, and a tenant may have inherited an undocumented fit-out.

The preparation challenge is to understand those dependencies before a routine booking becomes an unplanned business interruption. This guide focuses on occupied commercial offices. It covers the decisions a client can prepare, while leaving electrical working methods to competent specialists. The same approach can help a single business or a managing agent coordinating shared premises, although their authority to approve access may be different.

In this guide 5 sections
  1. Identify the office behind the address
  2. Involve the people who understand interruption
  3. Design a usable work window
  4. An empty floor still supports a live remote team
  5. Review restoration and the report together
Keep a copy

Read the guide offline or copy its planning points into your own records.

Download this guide as text
01

Identify the office behind the address

Confirm whether the instruction concerns a tenant suite, an entire building or common areas only. Identify distribution boards and available schedules without asking office staff to open equipment. Note recent fit-outs, desk moves and spaces used by other occupiers. A building reception contact may arrange entry while the tenant controls the relevant rooms. Where landlord and occupier responsibilities intersect, agree one coordinated instruction so the inspector is not left resolving a lease boundary on arrival.

02

Involve the people who understand interruption

Invite IT and operational representatives to identify dependencies, then ask what approval is needed to interrupt them. Do not treat “the servers have a UPS” as confirmation that isolation is harmless; the responsible specialist should explain the actual arrangement and recovery needs. Consider access control, security, telephony and remote-working infrastructure alongside visible desk equipment. The purpose is not to prohibit all interruption. It is to identify a controlled window and the people needed to release and restore affected services.

Office dependencyPerson or decision to involvePreparation record
Occupancy boundaryIdentify tenant suites, common areas and shared supplies.A marked floor plan and responsibility list.
IT dependencyAsk the responsible specialist how interruption and recovery are managed.Approved equipment and recovery notes.
Local supportConfirm an available person who can release rooms and answer queries.A visit-period contact and backup.
Staff noticeExplain the agreed access and interruption arrangements in usable language.A notice matched to the approved window.
RestorationName people responsible for checking affected business services.A client check and unresolved-issue record.
03

Design a usable work window

A useful window includes arrival, induction, access, agreed inspection activity and the client’s restoration checks. Compare evening, weekend and staged arrangements against actual staffing and approvals. An empty floor can be easier to access but harder to support if nobody can answer questions. Tell staff what will happen and ask them to report relevant equipment or access issues through a named contact. Keep escape routes clear and coordinate any temporary impairment of safety systems through the appropriate site procedures.

Practical checklist
  • Check that evening access includes the necessary keys and support people.
  • Identify security and access-control dependencies before agreeing isolation.
  • Tell the inspector about known changes since the previous report.
  • Avoid promising uninterrupted operation before the proposed scope has been reviewed.
04

An empty floor still supports a live remote team

Suppose a business chooses an evening inspection because everyone on the office floor will have gone home. Its communications cabinet also supports a customer team working from another location. The office manager knows the cabinet exists but has not asked IT about the consequences of interruption.

Bring the system owner into the planning conversation before confirming the window. Ask how the relevant services are supplied, what release is possible and who will check recovery. The inspection supplier can then explain the implications for the commissioned scope. If a supported evening window is available, brief the local contact and the remote team using that agreed plan. If it is not, review another sequence or time. Counting people at desks would not reveal this dependency; naming the business services connected to the premises does.

05

Review restoration and the report together

At the end of the visit, confirm what was inspected, what was restricted and what needs action. The site’s operational checks should verify the services it relies on; they do not replace the inspector’s technical work. Read the report against the agreed scope and record any further access required. For premises in England, the government’s offices and shops fire guidance can inform the wider fire risk planning; an EICR remains a different service from a fire risk assessment.

Related questions

Several services questions.

Is an evening visit always easier?

No. Access may improve, but approvals, escorts and recovery support still need to be available. Choose a window that can actually support the agreed work.

Does an EICR cover the office’s fire safety duties?

It assesses the commissioned electrical installation. Fire risk assessment and other fire safety checks have distinct scopes and should be planned accordingly.

Research & further reading

Sources used for this guide.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. HSE: Electricity at work — safe working practices ↗

    Safe systems of work, isolation and electrical permits. Planning guidance is not an instruction to carry out electrical work.

  2. GOV.UK: Fire risk assessment — offices and shops ↗

    Premises-specific fire risk considerations; use within the stated jurisdiction and building context.

  3. Reaction Group: Terms and conditions ↗

    Published service scope and EICR limitations, including access, records, additional work and agreed extent. Confirm the terms supplied with the actual quotation.

Inspection service

Several services: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request several inspection services

Share the relevant site information and the decisions still to be agreed. Reaction Group can scope the proposed service and confirm the arrangements in a quotation.