Electrical installation and equipment
Separate fixed wiring from desks, chargers and other equipment. Identify comms rooms, UPS arrangements and circuits whose isolation needs approval.
Plan electrical and fire inspections around a working office. Identify critical IT, landlord-controlled systems and the people who can approve access or interruption.
For facilities or office manager enquiries
Agree the fixed-wiring, appliance and landlord-system boundaries. Identify critical IT supplies and continuity arrangements separately.
Separate fixed wiring from desks, chargers and other equipment. Identify comms rooms, UPS arrangements and circuits whose isolation needs approval.
Assess the occupied layout, escape routes and shared-building interfaces. An individual office assessment does not replace coordination with the overall premises manager.
Select the inspection or servicing task. Existing records and your building use help establish an appropriate scope.
Inspection and testing of fixed wiring, with a condition report and classified observations.
See Offices details Request EICR testingAppliance inspections, electrical tests and an equipment register.
See Offices details Request PAT testingAssessment of fire hazards, existing precautions and recommended actions.
View the service Request fire risk assessmentsDoor-by-door checks with photographs and recorded defects.
View the service Request fire door inspectionsCondition checks, routine servicing and maintenance records for fire extinguishers.
View the service Request extinguisher servicingFunctional and duration tests, recorded results and identified faults.
View the service Request emergency light testingCombine the site information and access planning while keeping the inspection records appropriate to each service.
Separate fixed-wiring results from the desk and equipment register.
Request these servicesConnect occupied escape routes to the relevant lighting records.
Request these servicesRecord door findings against the office’s current fire arrangements.
Request these servicesSome inspection tasks may be compatible with occupation; electrical tests and isolation still require an agreed safe plan. Identify teams and systems that cannot be interrupted.
Establish the lease and maintenance boundary, then identify the contact who can authorise access. Do not silently treat unavailable shared supplies as inspected.
It concerns the fixed installation. Equipment maintenance and any PAT work need their own stated scope.
Provide floor plans, board schedules, tenant boundaries and the people authorised to approve access and interruptions.
Technical counts can be estimated or marked as unknown. Add existing reports, the country and location of each premises, operating hours and the contacts who control access.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Map the office’s electrical areas, business-critical equipment and realistic interruption windows before booking.
GUIDE · 4 MIN READPrepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.