White-label EICR.A complete handover.

Make branding, technical records and outstanding actions clear so the finished pack can be used with confidence.

Illustration of electrical plans, property photographs and a prepared document handover case on an office desk
From subcontractor to clientREACTION / GUIDES
The short answer

What should a white-label EICR handover contain?

A white-label handover should join agreed customer presentation to an intact technical record. Include the scope, site and installation identifiers, issued report, observation references, supporting files and outstanding questions. Agree who checks presentation, who handles technical queries and who issues revisions. Branding alone does not make a report ready for customer use.

A customer receiving an EICR needs to know what was inspected and what action follows. The contractor presenting it needs to know that the pack matches the order and can be explained without guessing.

White-label delivery adds a layer of presentation to that process, so a reliable handover must work at both levels. This guide describes how to organise the pack, review it and pass it on. It avoids treating white-label work as a way to change technical conclusions or hide an unresolved scope issue. The exact reporting and branding arrangements remain matters for the agreed service.

In this guide 5 sections
  1. Make the handover a controlled issue
  2. Review presentation and technical questions separately
  3. Build a pack the customer can use
  4. Correcting a customer name without creating competing reports
  5. Keep a clear route for later questions
Keep a copy

Read the guide offline or copy its planning points into your own records.

Download this guide as text
01

Make the handover a controlled issue

Identify the contractor’s customer reference and the inspection reference at the start of the pack. Explain which installation the documents concern and which instruction they fulfil. An email saying “certificate attached” can conceal missing schedules or an unclear boundary. Keep a pack index that names each file and its issue date. The reader should be able to distinguish the formal report, a management summary and a quotation for later work without opening every attachment to work out its purpose.

02

Review presentation and technical questions separately

Use two review passes. The presentation check covers names, logos, customer references and file naming. The technical query process covers scope, locations, observations and supporting information. If a technical question arises, return it to the appropriate reviewer rather than editing the issued report locally. Reaction Group describes white-label support publicly, but the detail of the handover should be agreed for the job. A brand specification should never become an instruction to alter an inspector’s finding.

Handover componentReview questionControlled record
Pack identityLink contractor order, customer reference and inspection reference.A cover index naming all issued documents.
Presentation approvalCheck agreed branding without editing technical content.An approved sample and named presentation reviewer.
Scope statementShow inspected areas and meaningful restrictions prominently.The issued extent and limitations section.
Action linkageCarry observation references into any customer action summary.A traceable finding-to-action list.
Revision routeDefine how queries are reviewed and corrected files issued.An issue register with reasons for change.
03

Build a pack the customer can use

Include a short customer action note where commissioned, written in plain language and linked to the source report. Show what needs a decision, who is arranging that decision and which matters remain unresolved. Preserve limitations and uncertainty instead of converting them into reassuring general statements. Where further investigation is recommended, arrange the appropriate review without waiting for a future anniversary. If classification or overall outcome needs explanation, use the report’s stated edition and current technical guidance rather than relying on an old template.

Practical checklist
  • Check the customer and installation names against the accepted order.
  • Open every file in the pack to confirm it is the intended version.
  • Keep the full report available alongside any shorter customer summary.
  • Record who will answer a question that arrives after the project has closed.
04

Correcting a customer name without creating competing reports

A hypothetical contractor receives an EICR pack carrying its branding, but the cover uses a former customer trading name. The project manager is ready to edit the PDF locally before emailing it. Meanwhile, the accounts team already holds the original file against the order.

Request a corrected issue through the agreed document route. Check the customer reference, installation identity and pack index at the same time, then record whether the revision changes presentation only or includes any technical amendment. If the customer has seen the earlier file, make the replacement clear. Keep one identified issued pack in the project record and mark the earlier version appropriately. For later jobs, put customer naming into the mobilisation checks. That removes a predictable source of confusion without inviting marketing or account staff to modify technical content themselves.

05

Keep a clear route for later questions

Decide who receives later questions from the customer and how they reach the testing team. Keep authorised revisions in one issue register, with the reason for change. When remedial work follows, retain the original inspection record and link the new evidence rather than replacing history. The final handover is successful when the contractor can explain the pack, the customer can identify the next action and the technical author can still trace exactly what was issued.

Related questions

Contractor EICR questions.

Can a contractor edit an EICR before sending it?

Presentation changes should follow the agreed issuing process. Technical content and authorised revisions need proper control; local edits can break the integrity of the record.

Should remedial quotations be part of the same PDF?

They can be handed over together if clearly separated. The inspection findings and a commercial offer for subsequent work serve different purposes.

Research & further reading

Sources used for this guide.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. Reaction Group: EICR for electrical companies ↗

    Public description of contractor and white-label support; individual delivery and branding arrangements require agreement.

  2. Reaction Group: Terms and conditions ↗

    Published service scope and EICR limitations, including access, records, additional work and agreed extent. Confirm the terms supplied with the actual quotation.

  3. IET: Inspection and testing FAQs ↗

    Competence and selection of periodic inspection intervals according to the installation and its circumstances.

Inspection service

Contractor EICR: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request subcontract EICR testing

Share the relevant site information and the decisions still to be agreed. Reaction Group can scope the proposed service and confirm the arrangements in a quotation.

No contact details needed for these first questions.Prefer to talk? 0203 885 2299
Call the teamGet a quote