EICR testing for healthcare premises.
Define clinical continuity, authorised electrical procedures and specialist installation limits.

Arrange EICR testing
around your healthcare & clinics.
Healthcare electrical testing begins with the operator’s technical and clinical arrangements. Identify the areas being inspected, the supplies on which patient care depends and the people authorised to approve the work. Provide available installation records and explain any HTM-related procedures or other local electrical rules that apply. Sensitive equipment, medical locations and specialist systems need an explicit competence and scope review rather than an assumption that a standard building visit covers them. Agree safe isolation, reinstatement and escalation before attendance, including the effect on appointments and controlled storage. The report should state the installation boundary and any limitations clearly. It is an inspection record for that instruction, not a blanket certificate of clinical or HTM compliance.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Can a clinic remain open during the work?
Only within an agreed safe plan that reflects clinical activity and the electrical tasks involved; continued occupation does not remove isolation requirements.
Is an EICR a certificate of HTM compliance?
No. The condition report has a defined scope and should not be described as comprehensive approval of the organisation’s electrical-management arrangements.
Tell us about
the premises.
Define the general installation and appliance work alongside the organisation’s authorised electrical procedures. Medical-device validation and specialist healthcare systems need a separate instruction.
Planning references
- Home Office: Healthcare premises fire-risk assessment ↗England landing-page scope
- NHS England: HTM 06-02 low-voltage electrical safety ↗Healthcare electrical management guidance; identify applicable organisational policy
- CQC: Regulation 15 — Premises and equipment ↗England / applicable registered providers
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
The commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
GUIDE · 4 MIN READHow to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
Request EICR testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
