Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Managing agents & residential blocks · Emergency light testing

Emergency light testing for residential blocks.

Keep shared-area lighting records traceable without assuming access to private homes.

Illustrated shared stair with emergency luminaires and an engineer planning access.
Plan this inspection

Arrange emergency light testing
around your managing agents & residential blocks.

Communal emergency-lighting work needs a clear boundary between managed shared areas, private dwellings and any commercial parts of the building. Provide the available lighting records, previous findings and a route or asset schedule. Identify who controls cupboards, plant rooms and access systems, and agree any resident communication or operational precautions needed for the proposed testing. Define whether functional, duration or other specified work is being requested rather than using 'lighting checks' as an unexplained label. The handover should identify the locations tested, failures and inaccessible assets. Keep any follow-up work linked to those references so the managing agent can distinguish a repaired fitting from an item that still needs access or further investigation.

Inspection scope

Know what the
service covers.

Functional and duration testing of emergency lighting. Agree testing and battery-recharge arrangements around occupancy, then receive recorded results and identified defects.

View the complete Emergency light testing service
REPORTING & FOLLOW-UP

Agree how the findings
reach your team.

  • Identify the fittings, locations, test method and results within the agreed scope.
  • Record failed or unavailable units and any limitations affecting test coverage.
  • Agree the handover for repairs, retesting and any operating arrangements needed during recharge.
Before you enquire

Questions before you book

Does the communal visit include lighting inside every flat?

Only if that is explicitly within the agreed instruction and appropriate access arrangements; do not assume it from a block address.

What if there is no reliable luminaire schedule?

Explain the gap before pricing and agree how asset identification and the inspection boundary will be established.

Request the work

Tell us about
the premises.

Identify communal installations, flat-controlled areas and the responsible parties. External-wall assessments, building-safety cases and individual flat inspections are separate instructions.

Planning references
Managing agents & residential blocks · QUOTE ENQUIRY

Request emergency light testing.

Start with the work required. Add your premises, access and preferred dates in the enquiry.

Prefer to call? 0203 885 2299
Talk to Reaction Group

Request emergency light testing
for your premises.

Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.

Request Emergency light testing quote0203 885 2299
Call the teamGet a quote