EICR testing for retail premises.
Define each store’s electrical boundary before applying a chain-wide schedule.

Arrange EICR testing
around your retail & store chains.
A retail EICR programme should identify each unit’s boards, tenant alterations and landlord-controlled interfaces before work is treated as a standard store package. Provide previous reports, available schedules and records of recent shopfit changes. Coordinate the proposed safe interruptions with tills, security, refrigeration and the people who restore those systems. Pre-opening access also depends on deliveries, staff presence and shopping-centre rules. Use store codes consistently in the reports, but keep local limitations and inaccessible areas visible. A central completion figure should sit above those records, not replace them. This allows the retailer to compare progress across locations while understanding the exact scope and follow-up decisions at each store.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Can every branch use the same circuit estimate?
Use it only as a clearly labelled starting assumption; confirm actual installation and alteration differences before treating it as a final scope.
What if a shopping centre controls an electrical area?
Arrange the relevant landlord or centre access and record any resulting limitation rather than implying that area was inspected.
Tell us about
the premises.
Identify the store’s installation, tenant areas and landlord systems. Shared shopping-centre systems need the appropriate owner’s instruction.
Planning references
- Home Office: Offices and shops fire-risk assessment ↗England landing-page scope
- HSE: Maintaining electrical equipment safety ↗Great Britain
- HSE: Using contractors (INDG368) ↗Great Britain
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
Plan inspection work across a retail estate
Prepare a consistent store brief while checking the local differences that affect access and interruption.
GUIDE · 4 MIN READHow to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request EICR testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
