EICR testing for warehouses.
Define supplies, operational zones and access above or around active logistics work.

Arrange EICR testing
around your warehouses & logistics.
Warehouse EICR planning should describe the electrical installation and the operational space around it. Provide board schedules, previous reports and the locations of supplies serving charging areas, conveyors and other plant. Explain which interfaces belong to specialist equipment maintenance rather than the fixed-installation instruction. Agree safe access with shift, dispatch and site-safety management, including any vehicle segregation or high-level work requirements. A night shift may be busier than the day, so the work window needs to follow the actual operation. The report should identify inspected areas, limitations and unresolved access. Use zone and board references that allow the maintenance team to connect each observation to the relevant part of the distribution centre.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Is an overnight visit always the best option?
No. Compare shifts, dispatch activity and authorised staffing before agreeing a safe inspection window.
Does the EICR certify a conveyor or forklift charger as machinery?
A fixed-installation inspection has its own boundary; equipment-specific safety and maintenance require separately defined arrangements.
Tell us about
the premises.
Separate building and appliance inspections from forklift, racking and process-machinery checks. Agree any specialist access needed before the visit.
Planning references
- Home Office: Factories and warehouses fire-risk assessment ↗England landing-page scope
- HSE: Warehousing ↗Great Britain
- HSE: Maintenance of work equipment ↗Great Britain
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
Coordinate warehouse electrical and fire inspection preparation
Plan around goods movement, restricted areas, access height and operational dependencies.
GUIDE · 4 MIN READHow to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.