EICR testing in Brighton & Hove.
Brighton & Hove shared-office EICRs: coordinate supplies and trading periods

EICR testing planning
for Brighton & Hove.
For a Brighton & Hove mixed office or retail building, identify the occupiers, shared supplies and parts controlled by the landlord. Trading hours do not necessarily describe office, cleaning or event activity in the same property. Provide existing schedules, previous findings and the person authorised to agree interruption for each included area. Where occupation or layout has changed, explain that change before the visit. Clear report references and access exceptions help the manager coordinate follow-up without assuming one commercial address means every occupier’s installation was included. The scope remains inspection of the agreed fixed electrical installation. Existing findings, limitations and any separately authorised investigation or repair should stay linked; the report is not a promise of automatic remedial completion.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Who arranges access in a shared building?
Name relevant occupiers and the manager controlling shared supplies and areas.
Can one evening slot be assumed to suit every occupier?
Confirm actual operation and interruption restrictions for each included area before agreeing a window.
Tell us about
the Brighton & Hove site.
Include the actual postcode, work required and access arrangements. Site availability and dates are confirmed for the enquiry.
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
How to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request EICR testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
