EICR testing in Cambridge.
Cambridge business-campus EICRs: make controlled supplies part of the brief

EICR testing planning
for Cambridge.
A Cambridge campus programme should begin with the individual building list, not a single campus name. Identify security, induction and technical contacts for each location. Explain any supplies supporting controlled environments, communications or temperature-sensitive equipment, and who can approve interruption and restart. The inspection boundary needs to distinguish ordinary fixed wiring from specialist research or process systems. For sites spread between northern business parks and southern research campuses, group visits around actual readiness and safe access rather than an assumed cross-city travel or shutdown window. The scope remains inspection of the agreed fixed electrical installation. Existing findings, limitations and any separately authorised investigation or repair should stay linked; the report is not a promise of automatic remedial completion.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Can a supply that must remain live be ignored?
Explain the operational restriction before the quote. The competent team must agree the approach and any report limitation.
Can a campus use one contact for every building?
Only if that person can actually arrange each site’s access and authorisation; otherwise supply local contacts.
Tell us about
the Cambridge site.
Include the actual postcode, work required and access arrangements. Site availability and dates are confirmed for the enquiry.
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
How to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request EICR testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
