EICR testing in Cardiff.
Cardiff office EICRs: identify occupier boundaries before choosing dates

EICR testing planning
for Cardiff.
For a Cardiff office or managed commercial building, identify tenant areas, landlord-controlled supplies and the people authorised to approve interruption. A central booking contact may not control security, plant or every tenant’s access. Provide circuit estimates, current schedules and previous findings, and explain any recent alterations. Where a wider estate includes Cardiff and neighbouring places, retain individual addresses and report references. A useful EICR handover describes the actual installation and limitations, allowing the building or facilities team to coordinate follow-up with the right occupier. The scope remains inspection of the agreed fixed electrical installation. Existing findings, limitations and any separately authorised investigation or repair should stay linked; the report is not a promise of automatic remedial completion.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Can offices outside central Cardiff share an enquiry?
List each actual address, local contact and scope rather than rely on the city label.
Is an after-hours date enough to authorise interruption?
No. Identify the person controlling the relevant supplies and restart arrangements.
Tell us about
the Cardiff site.
Include the actual postcode, work required and access arrangements. Site availability and dates are confirmed for the enquiry.
Premises in Wales
Use the guidance and duties applying in Wales. England-only residential fire-door requirements should not be assumed to apply to a Welsh property.
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
How to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request EICR testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
