EICR testing in Nottingham.
Nottingham occupied-office EICRs: separate access from electrical authority

EICR testing planning
for Nottingham.
An occupied Nottingham office needs both someone who can open the building and someone authorised to approve electrical interruption. Identify critical equipment and any landlord-managed supplies before choosing an evening or weekend window. If the building contains several tenants, list included areas and unconfirmed access separately. Provide current schedules and previous findings, and explain recent changes. The final records should identify the inspected installation and limitations clearly enough for the building manager to coordinate follow-up without assuming every tenant area was reached. The scope remains inspection of the agreed fixed electrical installation. Existing findings, limitations and any separately authorised investigation or repair should stay linked; the report is not a promise of automatic remedial completion.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Is a keyholder enough to approve a shutdown?
The enquiry should also identify the person authorised to agree interruption and restart of the relevant systems.
Can unconfirmed tenant areas be included as inspected?
No. Keep the scope and any access exceptions explicit.
Tell us about
the Nottingham site.
Include the actual postcode, work required and access arrangements. Site availability and dates are confirmed for the enquiry.
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
How to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request EICR testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.