Servers & communications
Identify essential supplies, backup arrangements and the IT contact. Agree shutdown and restart responsibilities instead of assuming equipment can simply be unplugged.
Plan fixed-wire inspection and testing around your building’s working day. Tell us the available evening or weekend windows, the circuits that must stay operational and who can authorise isolation.

A testing window needs enough time to arrange access, carry out the agreed inspection and manage the return to normal operation.
“EICR after hours” can mean an evening visit, a weekend shutdown or work split across several attendances. Give the actual usable hours rather than a general preference for nights. Include alarm setting, security cover, cleaning teams and any areas that stay occupied.
Confirm the scope, authorised contacts, critical supplies and safe access. Make previous reports and circuit information available.
Follow the agreed sequence and record any access or isolation limitations. Changes to the plan need a named person who can make decisions.
Agree who checks operational systems, manages restart requirements and receives any urgent findings before reopening.
Working after closing does not remove every operational restriction. Some supplies support activity around the clock.
Identify essential supplies, backup arrangements and the IT contact. Agree shutdown and restart responsibilities instead of assuming equipment can simply be unplugged.
Flag refrigeration, process equipment, alarms and building services. Explain time-sensitive stock, production sequences and any limits on an interruption.
Include night staff, residents, security and cleaners. Consider lighting, access controls and communications needed while occupied areas remain in use.
For some premises, a phased plan can fit the installation and available access better than a single attendance. The inspection scope, sequence, reporting arrangements and limitations still need to be clear.
Identify the boards, floors or sites involved and the deadlines that genuinely apply. Ask how incomplete access, additional findings and changes in the working window will be recorded. Splitting the programme should leave your team able to understand what has and has not been inspected.
Planning an estate-wide EICR programme?Include the number of attendances, usable testing hours, circuit estimates, access requirements and reporting scope. Security escorts, restricted areas and restart arrangements can affect the work as much as the clock time.
A weekend EICR quote should explain what is included and which assumptions need confirmation. There is no standard out-of-hours uplift quoted here; the team needs your building and delivery requirements to price the work.
No. Some inspection and testing activities require isolation. Working outside normal opening hours helps plan access and disruption, but the safe method and any shutdown remain installation-specific.
Include the exact dates and hours you can offer. Reaction describes evening, weekend and phased EICR options; suitable attendance and the inspection sequence need to be agreed for your site.
Share the reopening deadline and critical systems before a date is agreed. The programme needs suitable time, scope and contingencies; a preferred window is not a guarantee that unknown defects or access issues cannot arise.
Use the existing EICR findings page and include the report status and preferred access. Report follow-up and a new full inspection can require different work.
Use the detail to prepare your site information and questions for the team.
Add the premises, preferred access window and any critical equipment or reopening deadlines.