What electrical maintenance should a business review after relocation?
Check the new premises’ installation records and scope, confirm suitability for the intended activities and inspect moved equipment for damage and correct setup. Update locations, responsibilities and maintenance arrangements. Coordinate alterations through competent people and keep installation certification distinct from condition reports and equipment records, with open findings tracked before normal operation.
Existing reports can help, but only if their scope matches the new premises and their findings are understood. Moved equipment can also be damaged or lose its documented identity in transit. This article sets out a practical electrical review for a commercial relocation. It avoids treating relocation as an automatic demand for every possible test, while recognising that changed conditions can create new maintenance and design questions.
In this article 5 sections
Understand the premises you are taking on
Obtain the complete relevant EICR, schedules, available installation certificates, drawings and records of outstanding work. Read the extent carefully: the landlord’s report may cover common areas or part of the installation rather than the entire unit. Ask about limitations and recent alterations.
Compare those records with the actual intended occupation. A former office becoming a workshop creates different supply, equipment and environmental questions. The report is evidence about condition at a particular time and extent; it is not confirmation that the installation is suitable for every proposed business activity. Seek competent assessment of the intended use and any new work.
Plan alterations before furniture hides the installation
Identify new equipment loads, workstation arrangements and specialist services early. Have competent people design, install and verify any required alterations. Do not rely on a growing collection of extensions to solve an inadequately planned layout without considering the suitability of the arrangement.
In a hypothetical office move, desks are positioned before power and cable routes are agreed, leaving leads trapped beneath furniture. A planned layout could avoid both damage and later disruption. Coordinate electrical work with the fit-out, access requirements and future maintenance so boards and relevant equipment remain reachable after occupation.
Check equipment after transport and setup
Look for obvious damage to plugs, flexible leads, power supplies and enclosures, and report concerns before issue. Keep chargers and detachable components identifiable, particularly where several similar items have been mixed during the move. Use manufacturer instructions for setup and compatibility.
Moving does not by itself dictate the same formal test for every item. Consider equipment, handling, condition and any reason to suspect damage, with competent advice on appropriate inspection or testing. Known defects or uncertain repairs need attention rather than being waved through because the previous site’s label still has a future date.
Rebuild locations and responsibilities
Update the inventory to show where equipment is now used, stored and controlled. Reconcile disposals, transfers, new purchases and missing items. For shared buildings, agree landlord and tenant responsibilities for supplies, common areas and specialist systems. Name the people who authorise interruptions and handle defects.
Review the maintenance policy against the new environment. Equipment that was protected in a dry office may now be moved frequently or used in a more demanding area. The appropriate plan should reflect those conditions, not simply preserve the old site’s calendar. Communicate the new reporting route to staff as part of the move.
Create a clear occupation handover
Bring installation records, alteration certification, equipment exceptions and action owners into one document index. Keep the technical records distinct and link later work back to its source. Identify anything unresolved and obtain competent advice on any restrictions before normal operations depend on the affected equipment or circuits.
Use the move to establish records that the next team can follow. A careful starting point can prevent years of uncertainty about which report covers the unit, why a circuit is labelled that way or whether a damaged item was ever properly removed from service.
Keep a move exception list that crosses the workstreams without merging their technical records. It might include a missing premises schedule, an unverified charger and a new circuit awaiting documentation. Give each item an owner and clear closure evidence. Review it before signing off the move so small unresolved issues do not become permanent gaps once normal work resumes.
- Relevant premises reports and all schedules are available and understood.
- Proposed business use has been considered alongside installation condition.
- Alterations have competent design, verification and suitable documentation.
- Moved equipment and interchangeable supplies are checked and reconciled.
- New locations, shared responsibilities and reporting routes are recorded.
- Open findings and limitations have owners and occupation decisions.
Several services questions.
Does a recent EICR mean the premises can support our new machinery?
Not automatically. Condition reporting and suitability for a proposed load or alteration are different questions. Arrange competent design and assessment for the intended work.
Must every moved appliance receive a new PAT test?
No universal rule requires identical retesting solely because an item moved. Assess condition, handling, use and any reason to suspect damage, then choose suitable maintenance actions.
Find the relevant service details, access considerations and information to include in an enquiry.
Find inspection advice for your industry →Find your site area →Prepare a site inspection list →Sources used for this article.
The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.
- The Electricity at Work Regulations 1989 ↗
Great Britain: duties concerning safe systems, maintenance, isolation and competence. It does not set a universal annual PAT or five-year commercial EICR timetable.
- IET: BS 7671:2018+A4:2026 EICR model forms ↗
Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.
- HSE HSG85: Electricity at work, safe working practices ↗
Supports planning, competence, safe systems of work, isolation and control of work on electrical systems.
- HSE HSG107: Maintaining portable electrical equipment ↗
Supports equipment maintenance using user checks, formal visual inspections and appropriate tests, with decisions based on use, environment and findings.