Electrical testing · Question explained

Landlord or tenant: agree electrical testing boundaries before booking

A commercial building can have several overlapping boundaries: the lease line, the electrical distribution arrangement and the areas each organisation controls day to day. They may not coincide.

Request an EICR quote
The short answer

How should landlord and tenant electrical testing responsibilities be clarified?

Map the installation and equipment each party controls, check the lease and management arrangements, and agree the work boundaries and access in writing. Contractual allocation does not erase applicable safety duties. Identify shared supplies and systems, exchange relevant records and ensure no part is assumed to be covered solely because the other party holds a report.

That is why a landlord’s EICR does not automatically establish the condition of every tenant installation, and a tenant’s report may say nothing about shared equipment. Before commissioning work, the parties need a practical responsibility map. This article explains the information to gather and the decisions to record. It offers project-planning guidance, not a legal interpretation of a particular lease or a substitute for jurisdiction-specific advice.

In this article 5 sections
  1. Start with the physical installation
  2. Read the commercial arrangements carefully
  3. Compare report extents rather than report titles
  4. Coordinate access and interruption authority
  5. Create a living responsibility schedule
01

Start with the physical installation

Identify incoming supplies, landlord boards, tenant boards, submains and common areas using reliable records and competent input. Include external lighting, shared plant and any equipment serving more than one occupier. A demised floor may still depend on equipment outside it, while tenant alterations may sit within a building-wide installation.

Do not ask untrained staff to trace live conductors or open equipment to settle ownership. The aim is to gather records and questions for the competent team. Where the boundary is uncertain, record it as something to establish rather than assigning it by convenience in the maintenance spreadsheet.

02

Read the commercial arrangements carefully

Check the lease, licences, fit-out approvals and facilities agreement for relevant provisions. They may allocate inspection, repair, access or information-sharing tasks. Distinguish who arranges work from who pays and who controls the installation during normal use. Those can be different parties.

Great Britain’s Electricity at Work Regulations place duties according to the relevant role and control, not simply the wording of a contractor booking form. If the legal allocation is disputed, obtain appropriate advice. Meanwhile, coordinate sensible action on known dangers rather than allowing a responsibility discussion to become a reason for leaving an unsafe condition unmanaged.

03

Compare report extents rather than report titles

Ask each party for the complete report and schedules, then read the extent and limitations. Match board identifiers and covered areas to the physical map. Two documents with the same street address may cover different installations; one broad title may conceal an excluded tenant fit-out.

In a hypothetical business centre, the landlord’s report covers common corridors and landlord distribution, while each suite has its own downstream installation. The tenant needs to understand the interface and its own evidence gap. A copy of the landlord’s first page is useful context but cannot be treated as a complete assessment of every socket in the suite.

04

Coordinate access and interruption authority

Confirm who can authorise each isolation and who must be notified. Shared access control, communications, lifts or plant can create effects beyond the area being inspected. Site rules, escorts and specialist attendance should be agreed by the people who actually control those systems.

If one occupier cannot permit access or shutdown, record the resulting limitation specifically and agree a recovery plan. Do not quietly exclude the difficult area while leaving everyone to believe the building has been fully assessed. Clear communication is particularly important when an asset manager is relying on reports collected from several occupiers.

05

Create a living responsibility schedule

Record each installation part or equipment group, the controlling party, inspection arrangement, record location and action owner. Include arrangements for tenant alterations and end-of-lease handover. Review the schedule when units are divided, combined or refitted, because yesterday’s boundary may no longer match the electrical layout.

The useful result is not a declaration that everything belongs to one side. It is a clear, maintained account of who is arranging each necessary task and how the evidence reaches everyone who needs to rely on it.

Make the schedule explicit about evidence sharing after alterations. State who receives the new installation documentation, who updates drawings and how the other affected parties are informed. Without that step, a fit-out can leave the landlord with an old distribution map and the tenant with records that never reach the next occupier. Agree the handover route before the project closes.

Practical checklist
  • Supplies and boards are mapped with agreed, stable references.
  • Lease tasks, payment arrangements and operational control are distinguished.
  • Complete reports are checked for actual coverage and exclusions.
  • Shared systems have coordinated shutdown and restoration arrangements.
  • Unclear boundaries and missing coverage have named resolution owners.
  • Alterations and occupancy changes trigger a responsibility review.
Related questions

EICR testing questions.

Do residential landlord EICR rules automatically apply to a commercial lease?

No. Do not transfer residential-sector rules wholesale to commercial premises. Check the relevant jurisdiction, premises use and applicable duties, with legal advice where needed.

Can we rely on the landlord saying the building has a certificate?

Ask for the complete relevant records and read their extent, dates and limitations. The title alone does not establish coverage of your installation or equipment.

Research & further reading

Sources used for this article.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. The Electricity at Work Regulations 1989 ↗

    Great Britain: duties concerning safe systems, maintenance, isolation and competence. It does not set a universal annual PAT or five-year commercial EICR timetable.

  2. IET: BS 7671:2018+A4:2026 EICR model forms ↗

    Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.

  3. HSE HSG85: Electricity at work, safe working practices ↗

    Supports planning, competence, safe systems of work, isolation and control of work on electrical systems.

Inspection service

EICR testing: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request an EICR quote

Outline the shared and occupied areas, available reports and responsibility questions so the proposed scope can identify any gaps.