Can a commercial EICR be arranged without the previous report?
Yes, but tell the contractor that the record is missing and provide whatever reliable installation information remains. Circuit identification, planning and assessment may need more work. Search for the complete earlier report and alteration certificates, record the gaps honestly and use the new project to establish a traceable current record.
The temptation is to accept an old summary page, a sticker on a board or a confident statement that everything was checked. Those clues can help a search, but they cannot recreate the missing evidence. The practical response is to look systematically, explain the uncertainty and plan the new assessment around what is actually known. This article shows how a commercial team can make progress without pretending that a date on a label proves the condition of the installation.
In this article 5 sections
Search for the complete document
Ask the landlord, previous occupier, managing agent and former facilities provider for the report and all schedules. A document reference, inspection date or contractor name may help locate it. Search the property handover, maintenance portal and accounts records, but distinguish an invoice from the report it paid for.
If only part of the report is found, preserve it and identify the missing pages. The inspection schedule, circuit details, results and continuation sheets provide essential context. Do not combine unrelated pages from different dates to make a document appear complete. Tell the new contractor precisely what the recovered material does and does not establish.
Keep a search log with the organisation contacted, date, response and any document reference recovered. It helps prevent repeated requests and gives the incoming facilities team a clear account of what remains unavailable. Set a practical point for moving ahead with the new assessment rather than allowing an indefinite paperwork search to postpone a necessary review of the current installation.
Gather other reliable evidence
Installation certificates for additions, board schedules, diagrams and maintenance records may help explain the installation. Label each item with its source and date. Recent fit-out documents can be particularly useful where the previous occupier’s arrangement differs from what is now present.
Avoid guessing missing circuit descriptions or test results. A room name entered from memory can create false confidence when planning isolation. Mark information as unverified where appropriate and allow competent people to confirm it. A small, honest pack is more useful than a large folder whose reliability no one can explain.
Explain the gap before the quotation
Missing records can affect preparation, identification and the time needed on site. Ask whether a preliminary survey is useful and how uncertain circuit counts will be treated. Give bidders the same information so their assumptions can be compared fairly.
In a hypothetical commercial unit, the old board schedule survives but the kitchen and workshop have been remodelled. The contractor should know that the labels may not represent current loads. A quotation assuming accurate identification could otherwise appear attractive and then need revision once the actual work becomes clear.
Distinguish a missing record from a known defect
The absence of a report does not itself establish that the installation is dangerous, and it does not establish that it is sound. It is a gap in available evidence. Known damage, overheating, repeated trips or other concerns need their own prompt response rather than being treated as paperwork issues.
Share fault history and user reports with the inspector. If danger is suspected, seek competent advice on restrictions or making safe while the condition assessment is arranged. Do not keep using suspect equipment merely because an EICR appointment is booked for a later date.
Build the new record properly
Agree a clear scope and usable board identifiers, then review the finished report with its limitations and schedules. Create an action register for findings and a separate list of any areas not assessed. Record later repairs and alterations against the relevant references so future teams can follow the sequence.
Use a shared document index rather than relying on one employee’s inbox. Losing a report once is inconvenient; building a handover system that prevents the same problem is a practical improvement from the project.
- Search contacts and recovered documents are recorded with dates.
- Summary pages, invoices and labels are not presented as full reports.
- Drawings and schedules are marked current, historic or unverified.
- Known faults are reported independently of the missing-paperwork issue.
- The new quotation states assumptions about identification and access.
- Complete new records are stored where the next responsible team can find them.
EICR testing questions.
Can a date label tell us when the installation was last assessed?
It may provide a lead, but it does not supply the report, scope, observations or test schedules. Verify the underlying record where possible.
Does a recent fit-out certificate replace the whole EICR?
Not automatically. It may cover specific new work only. Check the certificate extent and discuss what evidence is needed for the remaining installation.
Find the relevant service details, access considerations and information to include in an enquiry.
Find inspection advice for your industry →Find your site area →Prepare a site inspection list →Sources used for this article.
The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.
- IET: BS 7671:2018+A4:2026 EICR model forms ↗
Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.
- HSE HSG85: Electricity at work, safe working practices ↗
Supports planning, competence, safe systems of work, isolation and control of work on electrical systems.
- The Electricity at Work Regulations 1989 ↗
Great Britain: duties concerning safe systems, maintenance, isolation and competence. It does not set a universal annual PAT or five-year commercial EICR timetable.
EICR testing: scope & records.