Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Commercial guide 4 min read

EICR scope.Know what is included.

Describe the installation boundary and understand how restrictions affect what the report can tell you.

Architectural cutaway illustration separating occupied office space from a technical service area
Make the inspection boundary clearREACTION / GUIDES
The short answer

What is the difference between an EICR scope and a limitation?

Scope identifies the installation being assessed. A limitation records an agreed or encountered restriction on inspection or testing within that assessment. Both should be specific enough to locate the affected parts and understand what remains unknown. Review restrictions against the reason for commissioning the report before accepting the inspection plan.

Two quotations can both say commercial EICR while offering different amounts of evidence. One may include every supply and a planned shutdown; another may cover selected boards during normal trading with several tests restricted.

The difference is not merely administrative. It changes what the resulting report can tell you. Sensible limitations are part of real inspection work, particularly in occupied buildings, but they need to be understood rather than hidden in a phrase about access. This guide shows how to commission a report whose boundaries match the questions your organisation actually needs answered.

In this guide 5 sections
  1. Describe the installation boundary
  2. Distinguish agreed restrictions from surprises
  3. Ask what the restriction prevents
  4. Do not buy a percentage without a method
  5. Review gaps at project close
Keep a copy

Read the guide offline or copy its planning points into your own records.

Download this guide as text
01

Describe the installation boundary

List included buildings, supplies and distribution boards using stable identifiers. Add the external areas, shared facilities and separately occupied spaces that matter. A floor plan is often the quickest way to expose ambiguity: show where the landlord’s installation ends and a tenant’s installation begins, subject to confirmation by the relevant parties.

Make exclusions equally clear. If specialist equipment or an additional supply is outside the commission, identify it and explain who is managing the related assessment. An exclusion should not disappear between the quotation and the report. Keep the agreed boundary available to the site coordinator during the visit.

02

Distinguish agreed restrictions from surprises

An agreed limitation is known when planning the work. An operational limitation arises during it, such as a room unexpectedly being locked or a circuit that cannot be disconnected as arranged. Both need a useful description and reason. Treat an unexpected restriction as a decision to manage, not a standard note to copy across every board.

For example, testing a circuit may be deferred because the equipment it supplies cannot yet be shut down. Record the circuit, affected work and reason. Then decide whether a further access window can resolve the gap. The limitation is part of the evidence, not evidence that the untested part is sound.

03

Ask what the restriction prevents

The phrase no shutdown allowed tells you little about the resulting assessment. Ask the inspector which inspection or test activities are affected and what conclusions remain possible. Different restrictions leave different uncertainties; a concealed cable route is not equivalent to a distribution board that could not be accessed at all.

The IET model form makes provision for extent and limitations, including practical limits on viewing concealed installation parts. An EICR is not normally an intrusive building survey that exposes every cable. If you need work beyond an ordinary condition assessment, describe that need explicitly and agree the appropriate investigation rather than assuming it is included.

A useful limitation review asks three questions: what evidence is missing, why does that evidence matter here, and what practical step could obtain it? Those questions turn a technical note into a management decision. They also help distinguish a normal non-intrusive inspection boundary from a preventable gap caused by unavailable keys, blocked access or an unapproved shutdown.

04

Do not buy a percentage without a method

Statements about sampling should explain what is sampled and how the approach can change if defects appear. A percentage of accessories opened is different from excluding a percentage of circuits or omitting a particular test. Those distinctions should survive into the finished report so later readers can follow the evidence.

In a hypothetical retail unit, an accessible office may be straightforward while heavily used stockroom sockets show repeated damage. A fixed small sample selected for convenience could miss the relevant pattern. Ask how the inspector will respond to condition, prior records and findings, and how any additional access or work will be authorised.

05

Review gaps at project close

Before closing the purchase order, reconcile the planned scope with the completed report. List any unassessed areas, the effect of each limitation and the decision on further work. Consider who else relies on the report, such as another occupier or an asset manager, and ensure they receive the same explanation.

A clear limitation does not automatically make a commission inadequate. The test is whether the remaining evidence is suitable for the purpose and whether the unresolved risk is being managed.

Practical checklist
  • Each included supply and board is named consistently.
  • Restrictions identify the affected area, activity and reason.
  • Sampling wording says what was sampled and how it was selected.
  • Access failures have an owner and a realistic recovery plan.
  • The report’s conclusions are read within the stated boundaries.
  • Any separate specialist assessment is tracked to completion.
Related questions

EICR testing questions.

Is a satisfactory result proof that every hidden cable was inspected?

No. The result applies to the stated extent and inspection conditions. Concealed installation parts are subject to practical limitations described in the report.

Should every limitation be removed?

Not necessarily. Some reflect the nature of a condition inspection. Others can be removed by better access or planned isolation. Ask which ones materially affect your objective.

Research & further reading

Sources used for this guide.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. IET: BS 7671:2018+A4:2026 EICR model forms ↗

    Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.

  2. HSE HSG85: Electricity at work, safe working practices ↗

    Supports planning, competence, safe systems of work, isolation and control of work on electrical systems.

Inspection service

EICR testing: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request an EICR quote

Identify the supplies, buildings and known access restrictions so the proposed extent and limitations can be made explicit.

No contact details needed for these first questions.Prefer to talk? 0203 885 2299
Call the teamGet a quote