What should count as a circuit when requesting an EICR quote?
Use the existing distribution-board schedules as a starting point and ask the contractor to confirm its counting method. Identify outgoing circuits, submains, additional supplies and uncertainty separately. Socket numbers and board ways are not reliable substitutes for an agreed circuit inventory, especially where labels are incomplete or three-phase loads are present.
Circuit count is a common quotation input because it helps describe the work more accurately than floor area alone. It is also easy to misunderstand.
A board with spare ways, a three-phase outgoing supply and several badly labelled circuits does not translate neatly into a count made from a quick photograph. The aim is not to make a non-electrician survey an installation. It is to provide a transparent estimate, show where it is uncertain and agree how the final scope will be confirmed. This guide explains what useful circuit information looks like.
In this guide 5 sections
Read the guide offline or copy its planning points into your own records.
Download this guide as textStart with records rather than socket counts
Collect the latest board schedules and the circuit schedules attached to the previous report. Record each board identifier and location. Count the listed outgoing circuits as an initial inventory while noting entries that are spare, unclear or known to have changed. Date the exercise so its relationship to later alterations is visible.
Do not count every socket as a separate circuit. Multiple outlets may belong to one circuit, and a single item of plant may have its own supply. Likewise, building size alone says little about circuit complexity. A modest workshop can contain more varied supplies and access constraints than a much larger open office.
Explain how boards connect
Show which boards supply other boards and which are connected directly to separate supplies. This helps the contractor see submains, downstream distribution and the scale of the installation. Use existing diagrams where available; do not remove covers or trace live conductors to improve a quotation spreadsheet.
Three-phase equipment needs an agreed counting convention. Some commercial pricing descriptions refer to circuits, poles or points in different ways. Ask for the definition in writing and compare suppliers on the same basis. The electrical arrangement and required inspection work matter more than forcing every quotation into a superficially identical headline number.
| Inventory entry | What to tell the bidder |
|---|---|
| Downstream board | Identify its supplying board or submain where known. |
| Three-phase outgoing supply | Request the bidder’s explicit counting convention. |
| Labelled spare | Mark whether the status is verified or provisional. |
| Unidentified circuit | Retain it in the uncertainty list; do not silently omit it. |
Keep spares and unknowns visible
A label saying spare may be wrong, and an unlabelled device may serve an overlooked load. Mark such entries as unverified rather than deleting them from the estimate. Give the contractor the chance to include a survey or a reasonable method for resolving the uncertainty during the project.
In a hypothetical office acquisition, an old schedule lists a storeroom circuit that now serves a refurbished kitchen. The count may be unchanged while the operational consequences and inspection needs have changed. This is why a good inventory contains descriptions and recent alterations, rather than just a total at the bottom of a page.
Make the inventory useful for procurement
For each board, supply a location, estimated circuit count, evidence source and confidence note. Add access conditions and whether controlled interruption is needed. Photographs of safely accessible board labels can help, but should be taken without opening equipment or compromising site rules.
Ask the quotation to explain what happens if the confirmed count differs. A clear rate or revised-scope process avoids an argument later about a number neither party could verify at booking. Also ask whether identification work and updating schedules are included. Producing accurate circuit information is useful work, but should not be assumed to come free with every inspection.
Keep the evidence source beside each estimate. A count taken from a recent schedule, an old report and an unverified photograph should not appear equally certain. A confidence note lets the contractor target a preliminary check where it matters and gives procurement a clear explanation for any later change. It also avoids silently treating an empty-looking board way as a verified spare.
Reconcile the finished schedules
When the report arrives, compare the boards and circuits shown with the agreed inventory. Query missing boards, unexplained numbering changes and excluded supplies. The objective is traceable coverage, not forcing the finished record to match an early estimate that was openly provisional.
Keep the reconciled schedule as the next project’s starting point. It can improve shutdown planning, fault reporting and future alteration work as well as making the next EICR quotation easier to assess.
- Every board has a unique reference and recognisable location.
- Submains and downstream boards are shown without hidden duplication.
- Spare and unidentified entries remain marked as unverified.
- Three-phase pricing conventions are defined in the quotation.
- Separate supplies and excluded installations are identified.
- Variations, circuit identification and schedule updates have agreed treatment.
EICR testing questions.
Can I count circuit breakers from a closed-board photograph?
It can help establish an estimate, but it cannot verify what each device supplies, whether labels are correct or how the contractor counts the work. Declare those limits.
Does a larger circuit count always mean a proportionately higher price?
No. Condition, access, identification, isolation arrangements and the nature of the circuits also affect the work. Compare the full scope and assumptions.
Find the relevant service details, access considerations and information to include in an enquiry.
Find inspection advice for your industry →Find your site area →Prepare a site inspection list →Sources used for this guide.
The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.
- IET: BS 7671:2018+A4:2026 EICR model forms ↗
Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.
- HSE HSG85: Electricity at work, safe working practices ↗
Supports planning, competence, safe systems of work, isolation and control of work on electrical systems.
EICR testing: scope & records.
See what the service includes and which site details help prepare a relevant quote.
View the service details