Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Electrical testing · Question explained

When equipment is missing on PAT day, record a gap rather than a pass

The assessor has finished the agreed visit, but several laptops are at home, a floor cleaner is on another site and tools are still in a van. Nothing unusual has happened; equipment availability is a normal commercial constraint.

Request PAT testing
The short answer

What should happen when equipment is unavailable for inspection or testing?

Record the item identifier, reason it was not assessed, responsible team and follow-up action. Keep it separate from passed equipment and reconcile it against the expected inventory. Decide whether access, a later visit or another suitable assessment is needed. A completed attendance does not demonstrate complete coverage of the business equipment population.

The quality of the maintenance process depends on what happens next. A missing item should not vanish from the register or inherit its previous result as though it had been seen again. This article explains how to manage unavailable equipment transparently, keep the follow-up proportionate and stop a successful appointment being confused with a completed equipment programme.

In this article 5 sections
  1. Compare results with an expected population
  2. Record a reason that supports action
  3. Decide the appropriate next step
  4. Do not confuse absent and failed
  5. Close the exception list deliberately
01

Compare results with an expected population

Use the equipment inventory as the starting point, grouped by area or responsible team. Ask the contractor to distinguish items actually assessed from those not presented or inaccessible. Record new items found during the visit as additions rather than silently replacing expected entries with whatever happened to be available.

An expected list does not need to be perfect to be useful. Mark uncertainty and improve it during reconciliation. The alternative, measuring success solely by the number of labels applied, gives the business no reliable way to tell whether important equipment was missed or whether retired items are still being chased.

02

Record a reason that supports action

Use specific statuses such as at another site, in use, inaccessible, under repair, not found or disposed of pending confirmation. These reasons need different responses. A laptop at home can be collected; an inaccessible machine may need an approved window; a missing asset may require an inventory investigation.

Include the item reference, normal location, responsible team and date. Avoid vague notes such as not done without explanation. Ask for a simple exception list at handover so the facilities team can assign actions immediately rather than extracting missing items from a long results file after everyone has left.

ExceptionNext planning question
At another siteWho controls access there, and when is it available?
In essential useWhat authorised window or replacement is practical?
Under repairWhat verification and return-to-service record is expected?
Not foundWhich team will resolve its location or status?
Disposal reportedWhat confirmation lets the register be closed accurately?
03

Decide the appropriate next step

Consider the equipment’s maintenance needs, known condition and use. Not every unavailable item demands an emergency return visit, but none should be treated as assessed without evidence. Seek competent advice where the risk or condition is uncertain, and act promptly on known defects regardless of scheduling.

In a hypothetical field team, tools are presented in two planned batches after different shifts. The first visit is recorded as partial completion with a named second window. That is a sensible programme. Describing the whole fleet as passed after the first batch would be a misleading record of the same work.

04

Do not confuse absent and failed

An absent item has not received the intended assessment. A failed item has an identified outcome requiring action. Keep those statuses separate, including any current restriction. Equipment removed from use because of a defect should remain controlled even if it later becomes unavailable for the scheduled contractor visit.

Previous results provide history, not a replacement for a missed assessment. Retain the original assessment date rather than copying a pass into the new visit’s date field. If an interval or maintenance action is revised, record the reason and responsible decision rather than quietly changing the record to make the exception disappear.

05

Close the exception list deliberately

Assign follow-up owners and realistic dates, then reconcile completed actions back to the register. Record assessment outcomes, confirmed disposal, repair or transfer as appropriate. Ask departments to confirm equipment movements before the next visit so the same unresolved gaps do not repeat.

For large sites, review exceptions as a small project with its own completion measure. That gives management a clearer view than a single statement that PAT is done, particularly where equipment is mobile or shared across several premises.

Set a review point for the exception list and report meaningful progress to the responsible manager. Use counts by reason and risk context rather than a bare outstanding total. That lets the business distinguish a planned second batch from a persistent access problem, and focus support on the items whose continued absence prevents a suitable maintenance decision.

Practical checklist
  • Expected items and newly discovered items are reconciled separately.
  • Every unavailable item has a specific reason and responsible team.
  • Missing equipment is not included in the passed count.
  • Known defects remain controlled regardless of availability status.
  • Follow-up assessment or another reasoned action is documented.
  • Disposal and transfer records prevent endless chasing of obsolete entries.
Related questions

PAT testing questions.

Can the contractor label an item from its previous record?

A record should reflect what actually happened. Do not apply a new assessment label or date as though an unavailable item had been inspected or tested.

Should we remove missing items from the inventory?

Only after confirming the appropriate status, such as disposal or transfer. Keep unaccounted-for equipment visible until its position is resolved.

Research & further reading

Sources used for this article.

The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.

  1. HSE HSG107: Maintaining portable electrical equipment ↗

    Supports equipment maintenance using user checks, formal visual inspections and appropriate tests, with decisions based on use, environment and findings.

  2. HSE: Portable appliance testing questions ↗

    Explains risk-based maintenance, new equipment, competence, and the position on annual testing, labels and records.

Inspection service

PAT testing: scope & records.

See what the service includes and which site details help prepare a relevant quote.

View the service details
Quote enquiry

Request PAT testing

Describe which groups are mobile, in use or off site so batches and follow-up access can be built into the maintenance visit.

No contact details needed for these first questions.Prefer to talk? 0203 885 2299
Call the teamGet a quote