Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Offices, branches & commercial equipment

Multi-site PAT testing.
Equipment records by location.

Coordinate portable electrical equipment inspections and testing across your business. Agree what equipment is included, when it will be available and how the results should be organised.

Illustration of workplace appliances and portable tools gathered for an equipment inspection schedule.
Start with equipment use

The same company.
Different equipment risks.

Equipment type, how it is used and its environment inform a maintenance regime. A shared renewal date should not replace consideration of those differences.

Office & IT equipment

Identify devices in daily use, sensitive equipment and items that may be away from the premises. Agree any isolation or disconnection arrangements rather than assuming all equipment is immediately available.

Tools & frequently moved items

Include maintenance stores, equipment issued to teams and items that travel between sites. Explain usage, working conditions and any visible damage pattern relevant to the equipment.

Shared & specialist assets

Say who controls the equipment and provide relevant manufacturer or specialist information. A maintenance or testing decision needs to fit the item rather than a blanket assumption about its label.

HSE does not set a universal legal requirement for every appliance to be PAT tested annually. The maintenance arrangements need to reflect the equipment and circumstances.

The site & equipment schedule

Estimate the assets.
Name the locations.

An approximate count is enough to start an enquiry. Explain where it came from and identify gaps before the final programme is agreed.

List each address, the likely equipment quantity, local contact and available testing hours. Include annexes, stores, kitchens and equipment held by mobile teams. If assets move between branches, agree how references will be retained or reconciled.

A reliable starting list improves the discussion about visits and reporting. It does not require presenting an estimate as an exact inventory.

Registers & exceptions

Account for the equipment
that was not presented.

A useful portfolio record shows more than completed checks. Agree how unavailable items, failed equipment and location changes will be communicated.

Equipment inspected

Record the agreed identification, location and result.

Equipment unavailable

Identify the gap and decide whether a separate attendance or another arrangement is needed.

Failed items

Communicate the result and the agreed action for the responsible team.

Asset movements

Keep the register understandable when equipment changes location or leaves the estate.

Comparable multi-site quotes

Agree the scope
behind the unit rate.

A price per item is only part of a programme quotation. Compare the equipment included, visit requirements, minimum charges where applicable, reporting and arrangements for missing or specialist items.

Specify whether local contacts will make equipment available and what disconnection permissions exist. Ask how extra items, inaccessible areas and follow-up visits are handled. Confirm these details before treating two headline rates as equivalent.

Need EICR and PAT together?

Fixed wiring inspection and portable equipment maintenance address different things. List both services and their separate quantities. Attendance may be coordinated while retaining distinct scope and records.

Plan EICR and PAT together
Before you enquire

Multi-site PAT testing questions.

Can every branch use one equipment register?

Agree the reporting structure and site identifiers. A combined register can be useful if it remains clear which assets and results belong to which location and how changes are recorded.

Do I need an exact appliance count before enquiring?

No. Give an estimate and explain the equipment groups and locations. The final scope, quantities and price assumptions need to be agreed.

Can remote workers or mobile teams be included?

Identify the equipment and where it can be made available. Work equipment away from the main office needs a suitable maintenance arrangement, not an assumption that it has been checked with the rest of the site.

Can testing happen outside our opening hours?

State the usable hours and local access arrangements in the enquiry. Attendance, equipment availability and any disconnection restrictions need agreement for the programme.

Quote enquiry

Request a multi-site PAT testing quote.

Add the property count, approximate equipment total and the access your local teams can arrange.

Request multi-site PAT testingPrefer to talk? 0203 885 2299
Call the teamGet a quote