What information should you send for a commercial EICR quotation?
Provide the premises and installation boundary, board and circuit information, previous records, known defects, access restrictions and workable isolation windows. Identify critical systems and shared responsibilities. Ask bidders to state assumptions, limitations, deliverables and variation handling so their prices relate to a comparable and useful scope of work.
When those details are missing, suppliers may make different assumptions, leaving procurement to compare totals for unlike work. This article provides a structured information pack for commercial sites. You do not need perfect records to use it: uncertainty is itself useful information, provided it is shown clearly rather than hidden behind an estimate that looks more precise than it is.
In this article 5 sections
Describe the premises and the purpose
State the building use, occupancy, operating hours and reason for commissioning the report. Explain whether the work concerns one unit, an entire building or a group of premises. Include any planned occupancy or fit-out changes that affect the assessment question or the available work windows.
List included supplies, boards and external areas where known. Identify shared or tenant-controlled installations and specialist systems requiring separate arrangements. If another stakeholder needs the report for a specific purpose, tell the contractor before the work rather than discovering afterwards that the agreed scope does not answer that requirement.
Supply records with a confidence note
Provide the previous EICR with all schedules, available installation certificates, board schedules and diagrams. Add dates and say which documents may be outdated. Photographs of accessible labels can help, but should not require opening equipment or breaching site rules.
Give an estimated circuit inventory if available, with unknown and spare entries marked. Ask how the contractor counts three-phase circuits, submains and downstream boards. A common counting basis helps compare quotations. Where records are poor, ask whether an initial survey or identification allowance is the better route to a reliable scope.
Explain access and interruption conditions
Describe locked areas, escort requirements, security clearance, stored materials and any restrictions around plant or production. Give realistic shutdown windows agreed with the teams controlling affected systems. Include IT and specialist service contacts where they are likely to be needed.
In a hypothetical shop, an evening booking sounds easy until the client learns that the only authorised alarm contact leaves before closing. The quotation should reflect a workable plan, not merely an unoccupied building. Confirm who will admit the team, authorise agreed interruptions and remain available for restoration or an urgent decision.
Declare known concerns and hazards
Tell the contractor about recurring trips, overheating reports, damaged accessories, recent leaks and other relevant concerns. Also provide site hazard information and local rules appropriate to the work. Do not wait for the inspector to rediscover information already known to the business.
Known concerns may require action before the planned inspection. Seek competent advice where danger is suspected. A quotation request is not a holding measure that makes continued use safe. Keep the immediate response and the wider condition-assessment project connected but recognise that they may need different timescales.
Request explicit outputs and assumptions
Ask for the report and relevant schedules, the planned extent, limitations, sampling approach and treatment of additional work. Clarify circuit identification, updated schedules, return visits, urgent make-safe arrangements and remedial quotations. Request reporting times separately from attendance dates.
Use the same pack for every bidder and keep answers to scope questions available to all relevant decision makers. A good quotation process produces a shared understanding of the work; it should not leave one person holding an important assumption that disappears when the project is handed to the site team.
Ask bidders to return a brief scope confirmation in the same order as your information pack. It should identify accepted facts, uncertainties and proposed exclusions. This gives the evaluation team a consistent place to find important assumptions and reduces reliance on a sales conversation that the site coordinator never heard. Keep the final confirmation with the order and make it available during attendance.
- Premises use, operating hours and assessment purpose are stated.
- Included supplies, boards and excluded systems are identifiable.
- Existing records have dates and reliability notes.
- Shutdowns, keys, escorts and decision makers are available.
- Known defects and relevant site hazards are disclosed.
- Deliverables, assumptions and variations are clear in the written offer.
EICR testing questions.
What if we do not know our circuit count?
Say so. Provide the records and safely available information you have, mark the uncertainty and ask the contractor how it proposes to confirm the scope.
Should we send the previous report even if it was unsatisfactory?
Yes. It helps explain known findings and later work. Include the related repair records so the contractor can understand the sequence rather than seeing an isolated headline.
Find the relevant service details, access considerations and information to include in an enquiry.
Find inspection advice for your industry →Find your site area →Prepare a site inspection list →Sources used for this article.
The linked guidance supports the factual context. Check its jurisdiction and the requirements for your actual premises.
- IET: BS 7671:2018+A4:2026 EICR model forms ↗
Primary report structure, extent and limitations, observations, circuit details, test results and recipient guidance. The article explains the form without reproducing it.
- HSE HSG85: Electricity at work, safe working practices ↗
Supports planning, competence, safe systems of work, isolation and control of work on electrical systems.
- The Electricity at Work Regulations 1989 ↗
Great Britain: duties concerning safe systems, maintenance, isolation and competence. It does not set a universal annual PAT or five-year commercial EICR timetable.
EICR testing: scope & records.
See what the service includes and which site details help prepare a relevant quote.