Electrical installation and equipment
Agree fixed-installation limits, process equipment interfaces and safe isolation/restart responsibilities with the site’s technical team.
Build the inspection plan around production, plant and controlled shutdowns. Distinguish the building installation from machinery, with technical permissions and restart responsibilities clearly agreed.
For engineering, maintenance or factory manager enquiries
Identify the building installation and the machinery it supplies. Machinery certification, explosion-risk assessments and specialist process systems require their own defined scope.
Agree fixed-installation limits, process equipment interfaces and safe isolation/restart responsibilities with the site’s technical team.
Identify the actual processes, stored materials and work activities. Specialist hazardous-area or process assessment needs its own competent scope.
Select the inspection or servicing task. Existing records and your building use help establish an appropriate scope.
Inspection and testing of fixed wiring, with a condition report and classified observations.
See Manufacturing & industrial sites details Request EICR testingAppliance inspections, electrical tests and an equipment register.
View the service Request PAT testingAssessment of fire hazards, existing precautions and recommended actions.
See Manufacturing & industrial sites details Request fire risk assessmentsDoor-by-door checks with photographs and recorded defects.
View the service Request fire door inspectionsCondition checks, routine servicing and maintenance records for fire extinguishers.
View the service Request extinguisher servicingFunctional and duration tests, recorded results and identified faults.
View the service Request emergency light testingCombine the site information and access planning while keeping the inspection records appropriate to each service.
Coordinate building supplies and suitable portable equipment within one production-access plan.
Request these servicesConnect fire priorities with the firefighting equipment serving actual processes.
Request these servicesTrack doors and lighting along the agreed factory escape routes.
Request these servicesYes, establish the safe access window, permit process and restoration responsibilities before booking the work.
Agree the installation/equipment interface explicitly. A building condition report does not resolve every duty for the connected machine.
Identify them during enquiry. Specialist competence and an appropriate scope must be established before any work is represented as included.
Discuss segregation, shared supplies and operational dependencies with the site’s technical team; separate areas may still share essential systems.
Technical counts can be estimated or marked as unknown. Add existing reports, the country and location of each premises, operating hours and the contacts who control access.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Coordinate commercial electrical isolations with critical systems, alternative supplies, competent control, authorised shutdowns and restoration checks.
GUIDE · 4 MIN READPrepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.