Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Manufacturing & industrial sites · EICR testing

EICR testing for industrial sites.

Agree where the building installation ends and specialist plant responsibilities begin.

Illustrated commercial switchroom with a locked isolator and electrical inspection equipment.
Plan this inspection

Arrange EICR testing
around your manufacturing & industrial sites.

A factory EICR should be planned with the people who understand its supplies and production dependencies. Provide existing schedules and reports, then define the electrical installation boundary and the connected equipment interfaces. Identify specialist or hazardous areas before they appear as an unexpected condition on inspection day. The site’s authorised people need to coordinate safe isolation, permits and restoration against the production plan; an engineer’s appointment does not itself authorise a machine restart. Record limitations and incomplete scope in a way the maintenance team can trace to particular areas and boards. Keep any recommendations for machinery or specialist systems separate from the general installation work that has actually been inspected and reported.

Inspection scope

Know what the
service covers.

Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.

View the complete EICR testing service
REPORTING & FOLLOW-UP

Agree how the findings
reach your team.

  • Use building, distribution-board and circuit references that your team can locate.
  • Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
  • Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Before you enquire

Questions before you book

Is a building EICR the same as machinery certification?

No. Machinery safety, maintenance and functional verification are separate questions from the condition of the fixed installation.

Can one line keep running while another area is inspected?

The site’s technical team must identify shared supplies and operational dependencies before any segregated work arrangement is agreed.

Request the work

Tell us about
the premises.

Identify the building installation and the machinery it supplies. Machinery certification, explosion-risk assessments and specialist process systems require their own defined scope.

Planning references
Manufacturing & industrial sites · QUOTE ENQUIRY

Request EICR testing.

Start with the work required. Add your premises, access and preferred dates in the enquiry.

Prefer to call? 0203 885 2299
Talk to Reaction Group

Request EICR testing
for your premises.

Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.

Request EICR testing quote0203 885 2299
Call the teamGet a quote