Fire risk assessments for industrial sites.
Build the assessment around processes, materials and changes to the production layout.

Arrange fire risk assessments
around your manufacturing & industrial sites.
A manufacturing fire assessment needs a clear account of the activities undertaken, the materials present and how people occupy the factory. Supply available plans, existing findings and relevant information on process, storage or layout changes. Identify activities that may need specialist assessment rather than assuming a general premises instruction resolves every process risk. The operator should be able to see which actions concern housekeeping and management, which involve the building or protection measures, and which need further technical input. Keep ownership and follow-up evidence connected to the finding. This makes the report usable during maintenance and production planning, while preserving the boundary between general premises fire assessment and specialist hazardous-process work.
Know what the
service covers.
Fire risk assessments for commercial premises and managed properties. Record fire hazards, existing precautions and the actions the responsible person needs to consider.
View the complete Fire risk assessments serviceAgree how the findings
reach your team.
- Identify the assessed premises, uses, responsible parties and information supplied.
- Keep findings and recommended actions linked to the relevant area and a named owner.
- Retain evidence of follow-up and the circumstances requiring the assessment to be reviewed.
Questions before you book
Does a general factory FRA replace DSEAR assessment?
No. Where specialist dangerous-substance risks exist, identify the separate assessment and competence needed.
Should a new production layout be mentioned before the visit?
Yes. Provide the current and proposed use information so the assessment is not based on an obsolete description of the factory.
Tell us about
the premises.
Identify the building installation and the machinery it supplies. Machinery certification, explosion-risk assessments and specialist process systems require their own defined scope.
Planning references
- Home Office: Factories and warehouses fire-risk assessment ↗England landing-page scope
- HSE: Maintenance of work equipment ↗Great Britain
- HSE: Using contractors (INDG368) ↗Great Britain
Request fire risk assessments.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
Planning electrical isolation for a commercial testing project
Coordinate commercial electrical isolations with critical systems, alternative supplies, competent control, authorised shutdowns and restoration checks.
GUIDE · 4 MIN READPreparing a commercial building for a fire risk assessment
A practical evidence pack, access plan and briefing for a useful commercial fire risk assessment.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request fire risk assessments
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
