Simple. Trusted. Compliance.Directly employed engineers · Nationwide coverageRG Connect customer login ↗
Offices · EICR testing

EICR testing for offices.

Agree the tenant/landlord boundary and business-system interruptions before inspection.

Illustration of an electrical inspector and facilities contact beside closed commercial distribution boards.
Plan this inspection

Arrange EICR testing
around your offices.

An office EICR should start with the distribution boards and circuits included in the instruction, not just the floor area on a lease. Provide current board schedules, alteration records and the contact for landlord-controlled supplies. An inspector cannot resolve an inaccessible shared riser by assuming it belongs outside the installation. Name the people who can approve interruptions to servers, security, access control and other business systems. Agree the safe testing windows and who checks that affected services are restored. The handover should identify the inspected areas, the limitations and the observations that need action. Keep those findings linked to the original report when investigation or repairs are commissioned later.

Inspection scope

Know what the
service covers.

Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.

View the complete EICR testing service
REPORTING & FOLLOW-UP

Agree how the findings
reach your team.

  • Use building, distribution-board and circuit references that your team can locate.
  • Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
  • Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Before you enquire

Questions before you book

Can staff stay at their desks?

Agree the tasks compatible with occupation and those requiring controlled interruption. Do not assume a live office means every test can be completed without isolation.

What if the landlord cannot provide access?

Record the unavailable part of the agreed scope and establish the next access action; an omitted area should not look completed in the report.

Request the work

Tell us about
the premises.

Agree the fixed-wiring, appliance and landlord-system boundaries. Identify critical IT supplies and continuity arrangements separately.

Planning references
Offices · QUOTE ENQUIRY

Request EICR testing.

Start with the work required. Add your premises, access and preferred dates in the enquiry.

Prefer to call? 0203 885 2299
Talk to Reaction Group

Request EICR testing
for your premises.

Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.

Request EICR testing quote0203 885 2299
Call the teamGet a quote