EICR testing for hospitality venues.
Plan safe interruption around refrigeration, preparation and service.

Arrange EICR testing
around your restaurants, pubs & hospitality.
A hospitality electrical inspection needs more than the venue’s customer closing time. Cooking, cleaning, refrigeration and early preparation may continue when the dining area is empty. Provide installation records and identify the supplies supporting food storage, extraction, tills, security and other essential functions. Agree who can approve an interruption and who checks the affected systems when power is restored. The installation boundary should distinguish building circuits from specialist equipment maintenance and other services such as gas safety. Use the handover to identify inspected areas, limitations and observations that need follow-up. A controlled work plan makes the scope reviewable without promising that every circuit can be tested while the kitchen continues operating.
Know what the
service covers.
Inspection and testing of fixed electrical installations in commercial buildings. Agree the circuits, access and shutdowns before the visit, then receive an Electrical Installation Condition Report.
View the complete EICR testing serviceAgree how the findings
reach your team.
- Use building, distribution-board and circuit references that your team can locate.
- Keep the agreed inspection extent, limitations and uncompleted areas with the EICR.
- Name the recipient for urgent findings and retain records of separately authorised follow-up work.
Questions before you book
Can the work start as soon as customers leave?
Check back-of-house activity and essential equipment first; customer closing time is only one part of the operating cycle.
Does an EICR cover gas appliances or extraction cleaning?
No. Those require separately defined services and appropriate specialists.
Tell us about
the premises.
Coordinate electrical and extinguisher work with separately arranged gas safety, extraction cleaning and specialist kitchen-system maintenance.
Planning references
- Home Office: Small/medium places of assembly fire-risk assessment ↗England landing-page scope
- HSE: Maintenance priorities in catering ↗Great Britain
- HSE: Maintaining electrical equipment safety ↗Great Britain
Request EICR testing.
Start with the work required. Add your premises, access and preferred dates in the enquiry.
Prefer to call? 0203 885 2299Useful inspection guides.
Writing a commercial fire extinguisher servicing specification
A clear service brief for asset coverage, findings, replacement approvals and site records.
GUIDE · 4 MIN READHow to plan a commercial EICR without losing control of the working day
Plan a commercial EICR with clear scope, useful records, realistic isolation windows and named owners for access, findings and follow-up.
GUIDE · 4 MIN READThe commercial inspection site readiness checklist
Prepare accurate installation information, safe access, relevant hazard information and named people who can authorise disruption.
Request EICR testing
for your premises.
Include the sites, work required and any deadlines. Scope, access, reporting and availability are agreed with the team.
